laitimes

Why is the intercom of the buildings in the ninth district of Majiawan not activated?

author:Two or three miles of information

"The intercom door of Building 1 was installed but not activated, and it was easy for strangers to enter the house. On April 22, Mr. Liu reported to Huashang Daily Ersanli Information that the owner of Majiawan District 9 paid a 300 yuan installation fee for the intercom door of the building to the property, but it was not used after installation, and he hoped that the property could be used normally.

Why is the intercom of the buildings in the ninth district of Majiawan not activated?

Mr. Shi, the owner, told reporters that there are two residential buildings in Majiawan District 9, and in April 2019, he paid 300 yuan for the installation of intercom doors to the property in the community. "After the installation, it has not been used, and strangers can easily enter the unit door through the community gate, and now the unit door has not enabled the building intercom, which has added some unsafe factors. ”

Why is the intercom of the buildings in the ninth district of Majiawan not activated?

In this regard, the reporter called Yan'an Baota District Property Service Co., Ltd. to understand the situation, the person in charge of Mr. Gao said: the building intercom door was installed for a period of time, but because some owners of the community do not care about the equipment, the building intercom door equipment has been damaged many times, which also increases the workload of the property. "The intercom door of this building was installed and opened, and now the damage is abnormal, and there will be problems at both ends in three days. ”

Why is the intercom of the buildings in the ninth district of Majiawan not activated?

Huashang Daily reporter Tang Baohu edited by Ma Nana

Why is the intercom of the buildings in the ninth district of Majiawan not activated?