laitimes

There are only 2 residential lands! The list of the first batch of plots to be transferred in Nanhai in 2024 has been announced! It is planned to be put on the net before August

author:Leju.com

The list of the first batch of plots to be transferred in Nanhai District in 2024 is announced!

On April 3, China Land Market Network announced the "List of the First Batch of Proposed Land Plots in Nanhai District, Foshan City in 2024", with a total of 2 residential land, and the latest proposed supply time is July 30. The two parcels of land are the land plot on the south side of Hongxing Road in Shishan Town and the land parcel in Huangqi Dongxiu Lot in Dali Town.

There are only 2 residential lands! The list of the first batch of plots to be transferred in Nanhai in 2024 has been announced! It is planned to be put on the net before August

Among them, the land on the south side of Hongxing Road in Shishan Town has a land area of 47,904 square meters and a plot ratio of ≤ 2.5. It is understood that the plot was withdrawn after being listed in 2023, and the parcel is located in the core area of Bo'ai Lake, close to Keji Road, close to Bo'ai Road Station of Metro Line 4, and surrounded by Mei Cube Garden, Splendid Huating and other plates.

There are only 2 residential lands! The list of the first batch of plots to be transferred in Nanhai in 2024 has been announced! It is planned to be put on the net before August

The parcel area is 182494 square meters, 2.49 < plot ratio is ≤3.37. From the point of view of location, the plot is about the Huangqi Dongxiu section of the expropriation and relocation project, which is an old village reconstruction project.

It is worth mentioning that the land control regulations for the expropriation and relocation project of Huangqi Dongxiu in Dali Town have been officially approved recently, and the project plans 3 residential plots and 1 primary school.

There are only 2 residential lands! The list of the first batch of plots to be transferred in Nanhai in 2024 has been announced! It is planned to be put on the net before August