laitimes

Connecting to the airport!Dongba R4 Line Phase I Planning Plan Publicity!

author:Beijing Neighborhood Circle

Today, Xiaobian learned from the official website of Beijing Infrastructure Investment Co., Ltd.: Beijing Rail Transit R4 Line Phase I North Section of the Line Integration Planning Plan Publicity, come and see it with Xiaobian~

Connecting to the airport!Dongba R4 Line Phase I Planning Plan Publicity!

Beijing Rail Transit Line R4 Phase I North Section Line Integration Planning Plan Publicity

First, the line overview

The northern section of the first phase of Beijing Rail Transit Line R4 is one of the third phase of the city's rail transit construction planning projects approved by the National Development and Reform Commission, and is a subway express line in the rail transit line network, covering Chaoyang Dongba Group, Shunyi New City Guomen Group, Shunyi New City Renhe Group. The construction of the project can further strengthen the attractiveness of urban rail travel at the Capital Airport, increase the proportion of green travel in landside transportation, support the construction of key functional areas, and guide the high-quality development of areas along the route. The line starts from the West Exit Station of Guanzhuang Road, Chaoyang District, reaches Yanjingqiao Station in Shunyi District in the north, passes through Chaoyang District, Tongzhou District and Shunyi District, and connects key functional areas such as Jinzhan International Cooperation Service Area, the Fourth Embassy District, the Airport Economic Zone of the Capital Airport, and the Sino-German Industrial Park, and plans to be interconnected with Line 3 in the near future.

2. Planning background

The plan implements the relevant requirements of the "Beijing Urban Master Plan (2016-2035)", "Beijing Rail Transit Network Planning (2020-2035)", "Opinions on Further Improving the Preparation and Management of the Integrated Planning and Management of Rail Transit Lines in Beijing (Trial)", and focuses on clarifying the technical standards of the line, the line station and the vehicle base planning scheme in combination with the needs of cities and transportation development along the line.

3. Technical standards

The northern section of the first phase of the R4 line is designed to run at a maximum speed of 120 km/h, and 4 A-type cars will be used in the initial and short-term directions, and 6 A-type cars will be used in the long term.

Fourth, planning principles

The first is to pay attention to the coordinated development of urban functions and the integration of stations and cities along the line, and guide the optimization of urban spatial structure; the second is to strengthen the connection and integration of the line and the comprehensive transportation system to improve the level of regional transportation services; and the third is that the project is economically reasonable and feasible.

Fifth, the line planning scheme

The northern section of the first phase of the R4 line is mainly laid along Dongba Street, Airport Second Expressway, Longtang Road, Tongshun Road and other roads, with a total length of about 21.3 kilometers, including 13.4 kilometers of underground lines and 7.9 kilometers of elevated lines, with a total of 5 stations, all of which are new stations.

1 new vehicle base is located in the area north of Shunyi Renhe Group, north of Chengbei Minhe River and west of Tongshun Road, covering an area of about 25 hectares.

The station and vehicle base of the publicity line are only planning schemes, and the specific implementation plans are subject to the approved design scheme.

6. Publicity method

The public solicitation of opinions adopts the online publicity method, and the portal of Beijing Infrastructure Investment Co., Ltd. (website https://www.bii.com.cn/).

7. Publicity time

The publicity period is 30 days, from April 26, 2024 to May 25, 2024.

8. Feedback

If you have any comments or suggestions on the plan during the publicity period, please contact Beijing Infrastructure Investment Co., Ltd. with your real name and contact information. This feedback will be conducted by phone and email.

(1) Contact number: 010-96123.

(2) E-mail: Please send the public comment form (Attachment 2) to the [email protected], and the email title should be filled in the format of "Solicitation of Opinions + Name of the North Section of the First Phase of Rail Transit Line R4". Please submit comments according to the above requirements, and those that do not meet the requirements will be regarded as invalid comments.

In the future, our company will carefully study and deal with the public opinions in accordance with the relevant regulations, and submit the results for approval according to the procedures after improving the results.

From the content of the announcement, we can see that in the announced route map of the R4 line, a Yanjingqiao station has been added to the north. Rail transit line R4 passes through the fourth embassy area, and sets up Guanzhuang Road West Exit Station in Dongba, which can serve the fourth embassy area, which will further enhance the transportation convenience of the surrounding areas of the fourth embassy area, and provide more convenient transportation support for the development of the embassy area and the travel of local residents.

It is understood that Guanzhuang Road West Station is located on the west side of the intersection of Louzizhuang Road and Dongwei Road, and is a station on both sides of an island. Line 3 is in the south and Line 12 is in the north (Line 12 can be transferred out of the city and Line 3 into the city at the same stage), and the transfer conditions with Line R4 are reserved. Guanzhuang Road West Exit Station is the eastern section of Line 3, which has not yet started construction.

Connecting to the airport!Dongba R4 Line Phase I Planning Plan Publicity!
Connecting to the airport!Dongba R4 Line Phase I Planning Plan Publicity!

On July 8, 2022, the first phase of Beijing Metro Line 20 (Line R4) officially entered the third phase of the Beijing Metro, and is expected to be completed and opened to traffic in 2028. If you have anything to say about this, please leave a message in the comment area~