laitimes

In the "maintenance" of the second Minjiang Bridge, we will strive to complete it before the "May Day".

author:Weijiazhou
In the "maintenance" of the second Minjiang Bridge, we will strive to complete it before the "May Day".

  The Second Minjiang Bridge in Leshan City is an important bridge connecting the east and west banks of the Minjiang River, and there are a lot of vehicles and pedestrians passing every day. However, when we passed the second Minjiang Bridge recently, we found that there were a lot of workers and construction vehicles on the bridge deck, what are you doing?

In the "maintenance" of the second Minjiang Bridge, we will strive to complete it before the "May Day".

  This afternoon, Xiaobian saw at the scene that there is a motorized lane and non-motorized lane on the bridge deck of the second Minjiang Bridge out of the city, and the workers are standing on the aerial work machinery and using professional tools to remove rust from the steel arch shape of the upper part of the bridge.

In the "maintenance" of the second Minjiang Bridge, we will strive to complete it before the "May Day".

  It is understood that in 2013, the second bridge of the Minjiang River was widened and repaired and reinforced, and at the same time, 32 steel structure arch rings were built on the bridge, but due to the erosion of many natural factors and external factors such as high air humidity on the river surface, high temperature in summer, large traffic volume, etc., the arch ring of the bridge gradually appeared rust and paint peeling off and other phenomena, in order to enhance the appearance of the bridge, maintain the "health" of the arch circle, the municipal housing and urban-rural development department decided to implement the emergency maintenance project of the steel structure arch ring of the second bridge of the Minjiang River.

In the "maintenance" of the second Minjiang Bridge, we will strive to complete it before the "May Day".

  "By removing rust and painting the steel structure of the second Minjiang Bridge, the durability of the bridge will be improved, and the bridge will serve the general public with a more beautiful and healthy attitude. According to Wang Qiang, the person in charge of the site, they will take advantage of the fine weather, work overtime, and strive to complete the work before May Day.

  It is believed that after the maintenance and repair of the relevant departments, the arch circle on the bridge will soon take on a new look and become a beautiful landscape. At the same time, passing vehicles and pedestrians are also reminded to pay attention to avoid when passing through the construction section and pass in a safe and orderly manner.

Source: Leshan Housing and Construction

Editor: Chen Sijie

Editor-in-charge: Zhang Dayang

Editor-in-chief: Wang Zhuoran

Read on