laitimes

Industry upstairs! Gather strength to build a "vertical factory"

In the Sany Industrial Park near Beiqing Road, Changping District, Beijing

It was built by China Construction Science and Industry

Sany Global Science and Technology Innovation Center Project

Actively implement the "industrial upstairs" model

Promote intelligent construction with new technologies

Achieve the goal of space intensification and functional complexity

Create a new highland for intelligent industrial agglomeration for Sany Industrial Park

Provide sufficient and high-quality space guarantee.

Industry upstairs! Gather strength to build a "vertical factory"

▲ Sany Global Science and Technology Innovation Center project that implements the "industrial upstairs" model

"Inch of land" produces "inch of gold": industry upstairs

The object will be scattered on the ground

R&D centers, office space and production facilities

Cleverly stacked vertically

Help Sany Industrial Park to realize the upstream and downstream agglomeration of the industrial chain

Help them effectively reduce operating costs

on a vertical area

40,000 square meters of high-standard industrial area have been added

The plot ratio increased from 1.5 to 2.5

Improve the land utilization rate of the park.

Industry upstairs! Gather strength to build a "vertical factory"

▲Vertical space structure diagram of the project

"Construction" to "Intelligent Manufacturing": Science and Technology Leading

items in the production process

Clever combination of BIM technology and robotics

Apply BIM technology to build accurate 3D models

And import the 3D model data into the mini arc welding robot

The mini arc welding robot starts welding based on the data provided by BIM.

Concrete laser leveling robot

Based on the data transmitted by BIM

Scratch-free construction of the ground with minimum pressure

The scraping and vibrating mechanism is automatically adjusted according to the height of the laser

Make sure the floor is at its best

A total of 9 robots are working efficiently on site.

Industry upstairs! Gather strength to build a "vertical factory"

▲The mini arc welding robot performs welding tests based on BIM data

The project was also applied

Floor thickness detector, digital ultrasonic flaw detector and other intelligent instruments

Monitor the quality of floor slabs and steel structures

At the same time as real-time data transmission and analysis

Rectify the quality problems of the project in a timely manner

Ensure the high-quality completion of construction tasks.

In terms of security management

The project uses high-support mold intelligent monitoring, intelligent environmental management and other systems

Analyze the risk points of people, materials and machines in the project

Help projects gain insight into safety hazards in advance.

Industry upstairs! Gather strength to build a "vertical factory"

▲Floor thickness detector and digital ultrasonic flaw detector are corrected in time

"Zero consumption" and "zero carbon": green construction

The project adheres to the concept of "green construction".

Widespread adoption of renewable, low-carbon building materials

Combined with advanced clean energy systems

Effectively reduce the emission of harmful gases

Make indoor formaldehyde, ammonia and other pollutants

20% lower than the national standard

By installing a soundproof curtain wall

It effectively isolates external noise interference

Create a quiet R&D office environment for the industrial park

Low refractive index glass is used

Reduce glare both indoors and outdoors

Protect the visual health of the surrounding residents.

In areas such as office corridors and rooftops

There are "indoor gardens" and "sky gardens".

Create "one area, one landscape"

Change people's "stereotype" of high energy consumption and high pollution in industrial parks

Give the building a fresh green and vibrant life.

Industry upstairs! Gather strength to build a "vertical factory"

▲The "hanging garden" installed on the roof

Read on