laitimes

Closed construction of the whole section in both directions! Pay attention to the detour

author:Palm Bayannur

Highway three detachment traffic control detour tips

In accordance with the deployment arrangements of the "Notice of the Traffic Management Bureau of the Public Security Department of the Inner Mongolia Autonomous Region on Adjusting the Speed Limit Value of Some Expressways", in order to complete the sixth batch of high-grade highway speed limit adjustment signs in the autonomous region as scheduled. Marking replacement construction work, G6 Beijing-Tibet Expressway Linhe Interchange to Mengning boundary section (K872-K1069) two-way closed construction, in order to ensure the safety of vehicle traffic during the construction period, after consultation with the traffic and transportation management department, the three detachments of the expressway decided to take the following traffic organization measures for the speed-up section, which is now reminded as follows:

1. High-speed closure section and time

1. From 7 a.m. to 7 p.m. on April 24, the G6 Beijing-Tibet Expressway Mengxi Toll Station (K1004) Yinchuan direction is closed to traffic, and the Beijing direction can be passed normally, and the Hainan Toll Station Section (K1054) is subject to traffic control measures in the Beijing direction, and the Yinchuan direction can be passed normally.

Closed construction of the whole section in both directions! Pay attention to the detour

2. From 7 a.m. to 7 p.m. on April 25, traffic control measures will be implemented in both directions from the G6 Beijing-Tibet Expressway Linhe Interchange to the Baragon North Interchange Bridge Section (K872-K946) and the Hainan Toll Station to the Mengning Boundary Wusitai Toll Station (K1054-K1069), prohibiting all vehicles from passing.

Closed construction of the whole section in both directions! Pay attention to the detour

Second, it involves the control of toll stations

1. From 7 a.m. to 7 p.m. on April 24, it will be closed (Wuhai Toll Station and Haibo Bay Toll Station), and all vehicles will be prohibited from passing in both directions. The Mengxi toll station is closed to traffic in the direction of Yinchuan and the direction of Beijing, and the Hainan toll station is prohibited to pass in the direction of Beijing and the direction of Yinchuan is normal.

2. From 7 a.m. to 7 p.m. on April 25, it will be closed (Linhe Toll Station, Linhe New Area Toll Station, Linhe West Toll Station, Toudaoqiao Toll Station, Dengkou Toll Station, and Wusitai Toll Station), and all vehicles will be prohibited from passing in both directions. The direction of Yinchuan is closed to traffic, and the direction of Beijing is normal. The Hainan toll station Yinchuan direction is closed to traffic, and the Beijing direction is normal.

3. Organize bypass measures

1. From 7 a.m. to 7 p.m. on April 24, the section of the Yinchuan direction of the Mengxi Interchange will be closed, and all vehicles on the main line in the direction of Beijing will leave the expressway from the Mengxi Expressway toll station (Figure 1.1) and bypass National Highway 110;

Closed construction of the whole section in both directions! Pay attention to the detour

Figure 1.1

Closed construction of the whole section in both directions! Pay attention to the detour

Figure 1.2

2. From 7 a.m. to 7 p.m. on April 25, the toll station of Linhe New Area, Linhe West Toll Station, Toudaoqiao Toll Station, Dengkou Toll Station, and Wusitai Toll Station will be closed. During the road closure control period, all vehicles coming from Beijing to Yinchuan will get off the highway at the Linhe toll station and detour along the Yellow Highway (Figure 2.1). All vehicles on the G7 Jingxin Expressway going to Beijing and Yinchuan will detour from the G7 Shaanba toll station to the national highway (Figure 2.2). Vehicles from Wuhai to Yinchuan will detour from the Hainan toll station (Figure 2.3), and all vehicles from Yinchuan to Beijing will get off the highway from the Wutai toll station and enter the highway from other toll stations in Wuhai (Figure 2.4).

Closed construction of the whole section in both directions! Pay attention to the detour

Figure 2.1

Closed construction of the whole section in both directions! Pay attention to the detour

Figure 2.2

Closed construction of the whole section in both directions! Pay attention to the detour

Figure 2.3

Closed construction of the whole section in both directions! Pay attention to the detour

Figure 2.4

In order to facilitate the travel of the masses, the detachment will adjust the traffic measures in a timely manner according to the construction situation, release in sections, please plan the driving route in advance, obey the command of the traffic police on duty, and drive cautiously according to the prompt signs, please forgive me for the inconvenience caused.

Traffic Management Bureau of Inner Mongolia Public Security Department

Highway three detachments

April 23, 2024

Source: Inner Mongolia Expressway No. 3 Detachment

Editor: Qiao Hong Proofreader: Yang Yakang

Read on