It is customary to overhaul the oil-immersed transformer where it needs to drain the oil core (or hang the bell cover) for maintenance, if there is no need to drain the oil, do not hang the core (hang the bell cover), only overhaul or oil replenishment externally, and carry out oil treatment is called minor repair.

Transformer major and minor repair, what is "repairing"?

1. Conventional transformer overhaul process

Transformer major and minor repair, what is "repairing"?

When the results of the electrical test and oil test show that the results are unqualified, it is necessary to carry out overhaul, and judge whether the transformer has the conditions for core inspection according to the on-site conditions, and then carry out relevant maintenance operations.

In addition to this reason, a hanging cover inspection is required in the following three situations:

1. The transformer is generally inspected within 5 years after it is put into operation.

2. When the main transformer running in the power system is subjected to the outlet short circuit, it can be considered to be overhauled in advance after comprehensive diagnosis and analysis.

3. When the transformer in operation is found to be in abnormal condition or has internal faults after testing, it should be overhauled in advance.

Second, the transformer overhaul project

Transformer major and minor repair, what is "repairing"?

Third, the overhaul site conditions

Transformer major and minor repair, what is "repairing"?

Fourth, the overhaul process

Remove the lead → electrical, oil backup test, insulation judgment→ part of the oil drain, disassemble the accessories and overhaul→ drain the oil and deal with it, remove the tap changer connector→ the hanging bell (body) body inspection, overhaul and test the insulation → if it is damp, dry it→ fill the oil according to the specified oil injection method→ install the casing, cooler and other accessories→ seal test→ oil level adjustment→ electrical and oil test → end

5. Transformer overhaul overhauls all components

Transformer major and minor repair, what is "repairing"?
Transformer major and minor repair, what is "repairing"?

Disclaimer: This article is transferred from the Internet, the copyright belongs to the original author, if it involves the copyright of the work, please contact us to delete it in time, thank you

Read on