The total investment is about 200 million yuan
It is planned to build a 60,000-square-meter logistics and distribution center
(including 50,000 tons of refrigerated warehouse)
It's in Minhou!
Wanquan (Fuzhou) common distribution center project
It will solve the bottleneck of the last mile of urban distribution in Fuzhou
↓↓↓
▲ (eye-catching "Wanquan Logistics" logo)
Multi-dimensional and multi-plate
Break through the bottleneck of urban distribution
Static pile drivers and excavators operate in an orderly manner
The workers do their job
……
In Wanquan (Fuzhou) common distribution center
(Phase II) project site
It's a busy scene
▲ (Wanquan (Fuzhou) Common Distribution Center (Phase II) under construction)
The second phase of the 27,500-square-meter warehousing project of Wanquan (Fuzhou) common distribution center project is under construction. After the completion of the project, it will solve the bottleneck of the last mile of urban distribution in Fuzhou, realize horizontal cooperation, intensive coordination and benefit sharing between enterprises, and build a multi-functional office area and a modern logistics park with complete supporting facilities.
▲(Construction site of the second phase of the project)
The second phase of the project plans to build two steel structure high-bay warehouses
A concrete high-bay warehouse
and a 24-meter-high intelligent three-dimensional warehouse with constant temperature and humidity
In addition, it is also equipped with a set office,
The central control and other functions of the park are integrated into the comprehensive building
▲ (Wanquan (Fuzhou) common distribution center phase I is running in an orderly manner)
Wanquan Group has been intensively cultivating in the logistics industry for 30 years, expanding and establishing a diversified logistics business sector in international, inter-provincial and inter-city multi-dimensional, and independently developing a supply chain management system, so the company has also achieved a hub center with full distribution coverage in Fujian, which can help Fuzhou cities solve the bottleneck of common distribution.
▲ (a lot of logistics and transportation vehicles come and go)
Wanquan Modern Logistics Co., Ltd
Director of Personnel and Administration, Chen Ying:
"At present, the pile foundation project of the elevated warehouse of the second phase of the project is basically completed, and it will be submitted for acceptance in the future. After passing, it will enter the construction of basic engineering and main engineering, and is expected to be put into use in the second half of the year. ”
Automation and intelligence
Save customer logistics costs
Wanquan (Fuzhou) common distribution center
It is adjacent to Honggan Road and Fuzhou Third Ring Expressway
And with the surrounding Shenhai, Fuyin, Beijing-Taiwan Expressway, etc
A well-established transportation network system enables seamless connections
▲ (Warehousing scale)
Adjacent to the site of the first phase of the second phase of the project, two modern logistics warehouses are operating in an orderly manner. At present, the first phase of the project has two storage centers with a total of about 35,000 square meters, equipped with high-level steel shelves, the introduction of modern logistics equipment such as automatic sorting, stacking, lifting, loading and unloading machinery, and also participates in the research and development of the use of warehouse management system (WMS) and supporting reading and writing equipment (RFID) to achieve informatization, automation and intelligent management.
▲ (Workers are busy unloading goods)
The first phase of the project has been in steady operation for 6 years
The project relies on the group's global supply chain system
The park has an advanced management system and high-quality hardware facilities
Establish a strategic partnership with customers
At various times in the past
for the society, people's livelihood and medical supplies, etc
It provides professional and powerful logistics support
▲ (Overlooking Wanquan (Fuzhou) Common Distribution Center • Cheng Zhao / photo)
"After the completion of the second phase of the project, through the common distribution platform, it can not only improve the loading rate of distribution vehicles, save logistics costs for customers, but also help reduce urban traffic congestion and environmental pollution, especially for food and drugs that need cold chain logistics, it can improve service coverage and greatly reduce the probability of commodity corruption and deterioration, so this is a cost-effective, efficient, low-carbon, and beneficial project. Chen Ying said.
Minhou County Rong Media Center
Chen Feng, Cheng Zhao, Zou Jie (intern) / The pictures in the text were taken by Chen Feng except for the signature
Editor: Lin Dan (small) Li Wenjun Proofreader: Song Guizhen Zhang Xiang Review: Pan Jie Producer: Xie Yongjie Ni Xinxin
You can enter the WeChat public account of "Meet Minhou".
Once you're on the homepage, remember to "Follow" and "star ★" us