laitimes

Some people disagree with the installation of elevators?

author:Xiangyang Radio and Television Station

On April 8, the revised "Administrative Measures for the Installation of Elevators in Existing Residential Buildings in Xiangyang City" has been officially released by the Municipal People's Government, which will be implemented from May 8, 2024 and will be valid for 5 years. For the problem that some owners do not agree with in the installation of elevators, a variety of solutions to the problem are listed.

"Xiangyang City Urban Existing Residential Elevator Installation Management Measures" urban district governments, development zone management committee to do a good job in the existing multi-storey residential elevator feasibility survey, and the census results in accordance with the "suitable for installation, difficult to install, not suitable for installation" three grades for classification publicity.

Some people disagree with the installation of elevators?

"Xiangyang City Urban Existing Residential Elevator Installation Management Measures" a household application to start the willingness to consult the work, there are the willingness to install elevators, should be on the intention to install elevators to solicit the opinions of all owners of the staircase (stairwell refers to the common use of the same staircase residential units). With the participation of the owners of more than two-thirds of the area of the exclusive part of the house and the number of owners accounting for more than two-thirds of the number of owners, and with the consent of the owners of more than three-quarters of the area of the exclusive part of the house and more than three-quarters of the owners participating in the voting, the application for the installation of elevators can be applied.

Community neighborhood committees, owners' committees, and property management service enterprises should actively assist applicants in soliciting the willingness of property owners to add ladders. For the owners of the elderly and disabled people at home (hereinafter referred to as special owners) who apply for the installation of elevators, the sub-district office shall support and coordinate the relevant units to help them complete the consultation within 3 working days.

After the preparation of the design plan for the installation of elevators is completed, the implementation subject shall be publicized in a prominent position and reported to the community, and the publicity time shall not be less than 5 working days.

Some people disagree with the installation of elevators?

Where stakeholders have objections during the publicity period, they shall submit them in writing to the community to which they belong with their real names, and the community is to guide the applicant to negotiate with the stakeholders. Where a consensus cannot be reached through consultation, an application may be made to the community to organize mediation. The owner may also apply to other mediation organizations for mediation to strive for unity of opinion among all parties. If no agreement can be reached after consultation and mediation, the owner may apply to the sub-district office to coordinate by convening a coordination meeting or hearing.

Support elevator leveling into the house, conditional existing housing can be installed in the way of leveling to enter the home, to achieve barrier-free access. When the existing stairwell platform or balcony cannot be used to realize the flat-floor entry, the flat-floor entrance can be realized by adding the entrance corridor, and the first-floor owner can also add the entrance corridor when conditions permit. The district-level planning department shall review the household plan in accordance with the principle of "one floor, one policy" in the joint review process.

Some people disagree with the installation of elevators?

The additional elevator belongs to the owner of the additional elevator, and the additional part is not included in the building area of the unit, and the property right area of the owners of each sub-household is not included, and the real estate registration is not handled.

After the elevator is completed and accepted, the owner can apply for the withdrawal of housing maintenance funds and housing provident fund according to the procedure.

After the elevator is completed and accepted and the registration certificate is obtained, the financial department will subsidize each elevator according to the standard of 100,000 yuan.

On the basis of the feasibility survey, the urban district government and the management committee of the development zone should actively explore the new mode of installing elevators in pieces, mobilize and guide the large-scale installation of elevators in the community, and strive for price concessions, high-quality after-sales and quality assurance for residents through centralized procurement. Strive to install elevators in pieces of unified planning, unified joint review, foundation pit and pipeline engineering and other preliminary work in place, elevator shaft, car installation and other projects in batches. Combined with the renovation of old communities, urban renewal, etc., the implementation of the installation of elevators in pieces, the installation of elevators into the scope of the renovation of old communities to solicit opinions, the overall implementation of the transformation scheme design, pipeline relocation, foundation pit excavation and other work.

(Not reproduced without permission)

Reporter: Tang Langang

编辑:刘斌贝 | 校对:黄娟

责编:李丹 | 审核:周嘉宾

Read on