laitimes

The detached overpass of the Hanhuang Railway on the upper span successfully "turned around"

author:Handan V Vision
The detached overpass of the Hanhuang Railway on the upper span successfully "turned around"

↑ The upper span of the Hanhuang Railway detached overpass in the process of turning (taken on March 31, drone photo).

On the same day, at the project site of the Hengshui section of the Handan-Huanghuagang Expressway near Xisang Village, Wuyi County, Hengshui City, Hebei Province, the 70-degree turn was completed in 70 minutes across the separated overpass of the Handan-Huanghua Railway.

Photo by Xinhua News Agency reporter Ren Liying

The detached overpass of the Hanhuang Railway on the upper span successfully "turned around"

  ↑ The upper span of the Hanhuang Railway detached overpass waits for a turn (taken on March 31, drone photo).

The detached overpass of the Hanhuang Railway on the upper span successfully "turned around"

  ↑ The upper span of the Hanhuang Railway detached overpass completed the rotation (taken on March 31, drone photo).

Read on