Good news!
Yinxing Road Changyi double line connection line
Realize the opening of municipal roads to traffic
Let's take a look at the latest real shots!
↓↓↓
The total length of the project is about 2.4 kilometers, starting from the east of the Third Ring Road (connecting to the Guanyinyan Interchange Toll Station of the Changyi Complex Line) and ending at Leifeng Avenue. The project is designed as an urban main road, with a standard road width of 46 meters, 6 lanes in both directions of the main road, 4 lanes in both directions of the auxiliary road, and a design speed of 60 kilometers per hour. Among them, the Guanyinyan tunnel in the project is about 498 meters long, and adopts the first four-arch tunnel excavation method in China, which fills the gap in the construction of four-arch tunnels in China, and the tunnel excavation span reaches 63 meters, creating the highest record of tunnel excavation span in China.
▲ The general layout of the project
With the joint efforts of Xiangjiang New Area and Wangcheng Economic Development Zone, the project successfully completed part of the acceptance and handover, and officially opened the municipal road to traffic on January 30. After opening, vehicles can drive east to Moon Island through Leifeng Avenue on Yinxing Road or under Leifeng Avenue.
Other than that
The west side of the Guanyinyan Tunnel of the project
The part of the highway is speeding up construction
It is expected to be fully opened to traffic in the first half of 2024
Let's look forward to it!
Source: Wangcheng release