1. Multiple choice questions (25 questions in total, 50 points in total)

1. If the lowest bid evaluation price method is adopted for public bidding of goods and services, the correct method of ranking the bid evaluation results is ( ).

A. Arrange the bidding quotation from low to high. Bids are tied with the same bids.

B. Arrange the bidding quotation from low to high. If the bidding price is the same, it will be ranked according to the merits of the technical indicators.

C. Arrange the bidding quotation from high to low. Bids are tied with the same bids.

D. Arrange the bidding quotation from high to low. If the bidding price is the same, it will be ranked according to the merits of the technical indicators.

Correct Answer: A

2. ( ) According to the special requirements of the procurement project, the specific conditions of the supplier can be stipulated, but the supplier shall not be treated differently or discriminated against under unreasonable conditions.

A. Financial department

B. Purchaser

C. Purchasing agency

D. Bid evaluation committee

Correct Answer: B

3. The list of government procurement items for energy-saving products includes computer equipment, showers and other major product items, and the list of government procurement items for environmental labeling products includes computer equipment, plastic products and other major product items.

A、11;20

B、20;35

C、30;50

D、18;50

Correct answer: D

4. Government procurement demand management refers to the activities of the purchaser to organize the determination of procurement needs and ( ) and implement relevant risk control management.

A. Carry out procurement activities

B. Review procurement requirements

C. Prepare a procurement implementation plan

D. Publicize procurement requirements

Correct Answer: C

5. In the process of government procurement supervision and inspection of a goods procurement project, the financial department of A involves the identification of small and medium-sized enterprises, and shall be responsible for the identification of ( ) in accordance with the regulations.

A. The competent department of small and medium-sized enterprises of the people's government at or above the county level where the goods manufacturer is registered

B. The government procurement supervision and management department of the people's government at or above the county level where the goods manufacturer is registered

C. The competent department of small and medium-sized enterprises of the people's government at or above the county level where the goods supplier is registered

D. The government procurement supervision and management department of the people's government at or above the county level where the goods supplier is registered

Correct Answer: A

6. Regarding the agency fee collection of purchasing agencies, the following statement is correct ( ).

A. The method and standard of agency fee collection shall be determined by the procurement agency and shall be clearly stated in the procurement documents.

B, in the procurement documents clearly stated in the agency fee collection standard is too low, the procurement agency may not issue the bid, transaction notice as a condition, requiring the winning bid, the transaction supplier to increase the cost appropriately.

C. In addition to the procurement agency fee, the procurement agency can also require the winning bidder and the transaction supplier to reimburse the labor fee of the evaluation expert and other expenses.

D. The purchaser shall agree on the method and standard of agency fee collection in the entrustment agency agreement, and the procurement agency shall collect agency fees in accordance with the agreement.

Correct answer: D

7. When the purchaser conducts a demand survey for market entities, the selection of survey subjects shall generally not be less than ( ), and shall be representative.

A、2

B、3

C、4

D、5

Correct Answer: B

8. In the process of handling government procurement complaints about a service project, the financial department of B involves the identification of small and medium-sized enterprises, and shall be responsible for the identification of ( ) in accordance with the regulations.

A. The competent department of small and medium-sized enterprises of the people's government at or above the county level where the procurement project is implemented

B. The government procurement supervision and management department of the people's government at or above the county level where the procurement project is implemented

C. The competent department of small and medium-sized enterprises of the people's government at or above the county level where the service provider is registered

D. The government procurement supervision and management department of the people's government at or above the county level where the service supplier is registered

Correct Answer: C

9. Government procurement shall follow the principles of openness and transparency, fair competition, impartiality, and ( ).

A. The principle of doing things according to law

B. The principle of efficiency

C. The principle of efficiency

D. The principle of good faith

Correct answer: D

10. The purchaser shall reply within seven working days after receiving the supplier's written challenge, and ( ).

A. Verbally notify the supplier to question the supplier and other relevant suppliers.

B. Notify the questioning supplier and other relevant suppliers in writing.

C. Verbally notify all suppliers.

D. Notify all suppliers in writing.

Correct Answer: B

11. Where the amount standard for public bidding is reached, and the circumstances provided for in paragraph 1 of article 31 of the Government Procurement Law are met, and only the procurement can be made from the sole supplier, the purchaser shall publicize the procurement project information and the name of the sole supplier on the media designated by the finance department of the people's government at or above the provincial level, and the publicity period shall not be less than ( ).

A, 5 days

B. 5 working days

C, 7 days

D. 7 working days

Correct Answer: B

12. Where the comprehensive scoring method is adopted for public bidding of goods and services, the proportion of the price score of the service items in the total score shall not be less than ( ), except for the implementation of the national unified pricing standards and the use of fixed-price procurement projects.

A、0.1

B、0.2

C、0.3

D、0.4

Correct Answer: A

13. Where competitive negotiation is used for procurement, the following procedures shall be followed:

A. Set up a negotiation team, formulate negotiation documents, determine the list of suppliers invited to participate in the negotiation, negotiate and determine the suppliers for the transaction.

B. Invite suppliers, negotiate, make final quotations, and determine suppliers.

C. Set up a negotiation team, invite suppliers to quote, review the negotiation team, and determine suppliers.

D. Invite suppliers, open bidding, negotiation, final quotation, and determine suppliers.

Correct Answer: A

14. On February 1, 2019, the Ministry of Finance and other four departments issued the "Notice on Adjusting and Optimizing the Implementation Mechanism of Government Procurement of Energy-saving Products and Environmental Labeling Products" (Cai Ku [2019] No. 9), which adjusted the management mode of government procurement of energy-saving products and environmental labeling products from the previous regular release of the list of certified government procurement energy-saving products and the list of environmental labeling products to the implementation of ( ) management.

A. List of items

B. Product list

C. Product catalog

D. Procurement catalog

Correct Answer: A

15. If a procurement agency maliciously colludes with supplier A to affect the winning bid or transaction result or may affect the winning bid or transaction result, the following handling methods are wrong ( ).

A. If the winning bid and the supplier are not determined, the procurement activities shall be terminated.

B. If it has been determined that A has won the bid and the transaction has not been performed, the contract shall be revoked and the procurement activities shall be terminated.

C. If it has been determined that A has won the bid and the transaction but the procurement contract has not been performed, the contract shall be revoked, and the winning bid and transaction supplier shall be determined from the qualified bid-winning and transactional candidates.

D. If the procurement contract has been performed and the losses caused to the purchaser and supplier, the responsible person shall be liable for compensation.

Correct Answer: B

16. The inquiry team shall be composed of more than an odd number of representatives of the purchaser and relevant experts, of which the number of experts shall not be less than the total number of members.

A、3;2/3

B、3;1/3

C、5;2/5

D、5;1/5

Correct Answer: A

17. When government procurement projects take performance as a qualification condition, suppliers are generally required to provide no more than ( ) contracts of the same kind of business, and the specific scope of similar business should be clarified.

A、2

B、3

C、5

D、10

Correct Answer: A

18. Among the following suppliers, those who can participate in government procurement activities in accordance with the law are ( ).

A. A medical equipment distributor was revoked from his medical device business license for illegal operation in the previous year.

B. An imported equipment agent, after winning the bid, gave up the bid due to the price increase of the imported equipment, and was prohibited from participating in government procurement activities within one year, and the prohibition period has not expired.

C. An accounting firm was fined 2.6 million yuan for false records in the audit report issued, and the penalty date was less than 3 years ago.

D. A printing company was fined 200,000 yuan for violating environmental protection laws and regulations in the production process.

Correct answer: D

19. The specific scope and content of government procurement of services are to be managed by a guiding catalog, and the guiding catalog is to be disclosed in accordance with law. The service items included in the guiding catalogue of government procurement of services, ( ), may implement government procurement of services.

A. The work needs of the unit

B. With the consent of the competent unit

C. The budget has been arranged

D. The unit leader agrees

Correct Answer: C

20. Where the comprehensive scoring method is adopted for public bidding of goods and services, the proportion of the price score of the goods item in the total score shall not be less than ( ), except for the implementation of the national unified pricing standard and the use of fixed-price procurement projects.

A、0.3

B、0.4

C、0.5

D、0.2

Correct Answer: A

21. According to the "Measures for the Administration of Government Procurement to Promote the Development of Small and Medium-sized Enterprises", for government procurement projects that are not specifically for small and medium-sized enterprises, as well as the non-reserved part of the procurement package in the reserved share project, the purchaser and the procurement agency shall give a deduction of 6%-10% (3%-5% for the project) quotation that meets the requirements, and participate in the review with the price after deduction.

A. Large enterprises

B. Medium-sized enterprises

C. Small and medium-sized enterprises

D. Small and micro enterprises

Correct answer: D

22. Government procurement quota standards, government procurement projects that belong to local budgets, are determined and published by ( ).

A. The people's governments of provinces, autonomous regions and municipalities directly under the Central Government

B. The people's governments of provinces, autonomous regions and municipalities directly under the Central Government or their authorized institutions

C. The financial departments of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government

D. The financial departments of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government or their authorized institutions

Correct Answer: B

23. The "Government Procurement Law of the People's Republic of China" stipulates that government procurement shall be implemented ( ).

A. Procurement demand refers to the technical and commercial requirements that the purchaser intends to purchase and the technical and commercial requirements that the purchaser needs to meet in order to achieve the project objectives.

B. Combination of centralized procurement and decentralized procurement.

C. The procurement requirements can be vague, which is conducive to the free play of suppliers when bidding and responding.

D. The higher the requirements and indicators of procurement demand, the better, which is conducive to ensuring the quality of procurement.

Correct Answer: B

24. The bid evaluation committee believes that the bidder's quotation is significantly lower than the quotation of other bidders who have passed the compliance review ( ), and shall require it to provide a written explanation within a reasonable time at the bid evaluation site, and submit relevant supporting materials if necessary;

A. It may affect the quality of the product or fail to perform the contract in good faith

B. It may be lower than its cost

C. It is more than 20% lower than the average quotation

D. More than 20% lower than the next lowest price

Correct Answer: A

25. If the supplier believes that its rights and interests have been harmed by the procurement documents, the procurement process, and the results of winning the bid or closing the transaction, it may raise a challenge to the purchaser in writing within the date on which it knows or should know that its rights and interests have been damaged.

A, 7 days

B. 7 working days

C, 15 days

D. 15 working days

Correct Answer: B

2. Multiple choice questions (15 questions in total, 30 points in total)

1. The budget of a service project exceeds the standard of the amount of public bidding, and after public bidding, there are less than three suppliers participating in the bidding after the end of the bidding deadline, and the following treatment is correct ( ).

A. There are no unreasonable terms in the bidding documents, and the bidding procedures comply with the regulations, and the purchaser shall report to the financial department for approval in accordance with the law, and adopt competitive negotiation for procurement.

B. If there are unreasonable terms in the bidding documents, the purchaser shall re-bid after correction.

C, after the financial department review that the tender announcement time does not meet the requirements, decided to scrap the bid, instruct the purchaser to re-tender.

D. The purchaser decides to cancel the procurement task.

Correct answer: ABD

2. Among the following items, those that shall not be included in the scope of government procurement of services are ( ).

A. Services that do not fall within the scope of the government's responsibilities

B. Matters that should be directly performed by the government

C. Government procurement of goods and projects stipulated by laws and administrative regulations, as well as projects that package projects and services

D. Personnel recruitment and employment of the purchasing entity, employment in the form of labor dispatch, and the establishment of public welfare posts

Correct answer: ABCD

3. Which of the following conditions should be met by the complainant to file a complaint?

A. The complaint has been challenged in accordance with the law before the complaint is filed

B. The content of the complaint is in accordance with the regulations

C. File a complaint within the validity period of the complaint

D. The same complaint has not been handled by the financial department

Correct answer: ABCD

4. Except for government procurement information that involves state secrets, suppliers' trade secrets, and government procurement information that laws and administrative regulations provide should be kept confidential, which of the following government procurement information must be announced? ( )

A. Regulations on government procurement formulated by the Ministry of Finance

B. Centralized procurement catalogue published by Zhejiang Provincial People's Government

C. The assessment results of the Hangzhou Municipal Finance Bureau for centralized procurement institutions

D. The decision on handling government procurement complaints made by the Chun'an County Finance Bureau

Correct answer: ABCD

5. A municipal water affairs bureau entrusted a procurement agency to conduct public bidding for a river improvement project in the city, which uses financial funds and has a procurement budget of 8.6 million yuan. The project ( ).

A. It is a government procurement project

B. It is a project that must be tendered

C. For government procurement projects that must be tendered, the bidding and bidding law shall apply

D. It is a construction project, not a government procurement project

Correct answer: ABC

6. With regard to the form of procurement under framework agreements, the following statement is correct ( ).

A. Framework agreement procurement includes closed framework agreement procurement and open framework agreement procurement.

B. Open framework agreement procurement should be the main form of framework agreement procurement.

C. Closed-ended framework agreement procurement should be the main form of framework agreement procurement.

D. There is no distinction between closed framework agreement procurement and open framework agreement procurement, and the solicitor can decide which form to adopt independently.

See the answer

Correct answer: AC

7. Except for single-source procurement projects, suppliers who provide ( ) services for procurement projects shall not participate in other procurement activities of the procurement project.

A. Accept the demand survey

B. Overall design

C. Specification preparation

D. Project management, supervision, testing, etc

Correct answer: BCD

8. Before the start of procurement activities, if the purchaser conducts a key review of the procurement demand and the procurement implementation plan, the following reviews shall be mainly carried out ( ).

A. Non-discriminatory review

B. Competitive review

C. Procurement policy review

D. Performance risk review

Correct answer: ABCD

9. If the complainant has any of the following acts, it is a false or malicious complaint, and the financial department shall include it in the list of bad behavior records, and prohibit him from participating in government procurement activities for 1 to 3 years. ( )

A. Fabrication of facts

B. Providing false materials

C. Obtaining supporting materials by illegal means. Where there are obvious doubts about the legality of the source of evidence, and the complainant is unable to prove that the method of obtaining it was lawful, it is to be viewed as having obtained the evidentiary materials by illegal means

D. More than three complaints within 12 months nationwide have no evidence

Correct answer: ABC

10. "Measures for the Administration of Non-bidding Procurement Methods for Government Procurement" (Decree No. 74 of the Ministry of Finance) stipulates that "when there are only two suppliers for the procurement of goods and services in public bidding, the bidding documents are submitted during the bidding process or the substantive response to the requirements of the bidding documents is reviewed, and the purchaser and the procurement agency can conduct competitive negotiation and procurement with the two suppliers after being approved by the financial department at the same level in accordance with Article 4 of these measures".

A. Refers to the financial department of the purchaser at the same level

B, refers to the procurement agency at the same level of the financial department

C. Including the financial departments of the people's governments at all levels

D. Including the financial departments of the people's governments of cities divided into districts and autonomous prefectures, as well as the financial departments of the people's governments at the county level that are directly managed by the province and approved by the people's governments at the provincial level

Correct answer: AD

11. Which of the following can be used as part of the procurement implementation plan ( ).

A. Procurement project budget

B. Supplier qualifications

C. Type of contract

D. Performance acceptance plan

Correct answer: ABCD

12. Regarding the selection of procurement methods, evaluation methods, and pricing methods for government procurement projects, the following statements are correct ( ).

A. It shall comply with the statutory application circumstances and the characteristics of procurement needs, among which, if the amount standard of public bidding is reached, and the procurement method other than public bidding needs to be adopted due to special circumstances, it shall be approved in accordance with the law.

B. Procurement projects with objective and clear procurement needs and unified specifications and standards, such as general equipment, property management, etc., are generally procured by bidding and inquiry, and the price is the main consideration for awarding the contract, and the pricing method of fixed total price or fixed unit price is adopted.

C. Procurement needs are objective and clear, and the technology is more complex or professional procurement projects, such as large-scale equipment, consulting services, etc., generally use bidding, negotiation (consultation) procurement, through comprehensive review to select the most cost-effective products, the use of fixed total price or fixed unit price pricing method.

D. Procurement projects that cannot fully determine the objective indicators and need to be provided by the supplier with design schemes, solutions or organizational schemes, such as design services, public-private partnerships, etc., are generally procured by negotiation (consultation), comprehensively considering factors such as single scheme quotation, multi-scheme quotation and cost-effective requirements, and adopt a single or combined pricing method such as fixed total price or fixed unit price, cost compensation, and performance incentives according to the requirements of achieving project objectives.

Correct answer: ABCD

13. According to the Administrative Measures for Promoting the Development of Small and Medium-sized Enterprises in Government Procurement, procurers shall increase the share of small and medium-sized enterprises in government procurement and support the development of small and medium-sized enterprises by implementing which of the following measures: ( )

A. Reserve the purchase share

B. Price review preferential

C. Priority procurement

D. Single-source procurement

Correct answer: ABC

14. If a government procurement project meets any of the following circumstances, the number of members of the bid evaluation committee shall be more than 7 odd numbers. ( )

A. The procurement budget amount is more than 10 million yuan

B. Complex technology

C. The social impact is greater

D. The supplier needs to provide the design plan

Correct answer: ABC

15. Welfare units for persons with disabilities enjoying government procurement support policies shall meet the following conditions at the same time:

A. The proportion of the resettled disabled persons in the number of employees in the unit shall not be less than 25% (including 25%), and the number of resettled disabled persons shall not be less than 10 (including 10 people).

B. A labor contract or service agreement of more than one year (including one year) has been signed with each disabled person in accordance with the law.

C. Through banks and other financial institutions, each disabled person resettled shall be paid a monthly wage not lower than the monthly minimum wage standard approved by the provincial-level people's government applicable to the district or county where the unit is located, and each disabled person shall pay social insurance premiums such as basic endowment insurance, basic medical insurance, unemployment insurance, work-related injury insurance and maternity insurance in full on a monthly basis.

D. Provide goods manufactured by the unit, projects or services undertaken by the unit, or provide goods manufactured by other welfare units for the disabled (excluding goods using the registered trademarks of welfare units for the disabled).

Correct answer: ABCD

3. True/False Questions (10 questions in total, 20 marks in total)

1. In order to optimize the business environment and promote the development of small and medium-sized enterprises, more and more government procurement projects are exempting bidding (response) deposits for small and medium-sized enterprises. This means that in the future, small and medium-sized enterprises can be more assured to "bid at a low price", and if they don't want to do it after winning the bid or transaction, it is a big deal to give up winning the bid and closing the transaction, and they don't have to worry about being held legally responsible anyway. ( )

A. Correct

B. Error

Correct Answer: B

2. For procurement contracts signed through measures such as reserving procurement items, reserving special procurement packages, requiring participation in the form of consortiums, or contract subcontracting, this contract shall be clearly marked as a reserved contract for small and medium-sized enterprises. ( )

A. Correct

B. Error

Correct Answer: A

3. The purchaser or procurement agency is responsible for organizing the bid evaluation work, and paying labor remuneration and travel expenses for off-site evaluation to the members of the bid evaluation committee in accordance with the regulations. ( )

A. Correct

B. Error

Correct Answer: B

4. In the process of inquiry and procurement, if the purchaser or procurement agency believes that the supplier's quotation is too high, it can negotiate with the supplier and ask it to reduce the price. ( )

A. Correct

B. Error

Correct Answer: B

5. In the bid evaluation, due to the absence, recusal or health of the members of the bid evaluation committee, the composition of the bid evaluation committee does not meet the provisions of these measures, the purchaser or procurement agency shall continue to evaluate the bid after making up for it in accordance with the law. The bid evaluation opinions made by the replaced members of the bid evaluation committee are invalid. ( )

A. Correct

B. Error

Correct Answer: A

6. The purchaser has the right to choose the procurement agency by itself, and no unit or individual shall designate a procurement agency for the purchaser in any way, and shall not force the purchaser to use random methods such as drawing lots and lottery numbers or comparing the selection method to select the procurement agency. ( )

A. Correct

B. Error

Correct Answer: A

7. The text of the government procurement contract in the bidding documents of a furniture government procurement project stipulates: "After Party B delivers the goods and is accepted by Party A, Party A shall pay the remaining contract payment, but retain 5% of the contract balance as a quality deposit." "This practice by the procurer is permitted by the laws and regulations governing government procurement. ( )

A. Correct

B. Error

Correct Answer: B

8. The evaluation of government procurement projects shall be conducted under strict confidentiality. For government procurement projects that enter the public resources trading platform, the review site should be managed by the staff of the public resources trading center, and the procurement agency review organization personnel shall not enter the review site. ( )

A. Correct

B. Error

Correct Answer: B

9. In government procurement activities, the registered capital, total assets, operating income, tax payment, operating years, and performance of the enterprise shall not be used as the qualification requirements or evaluation factors of suppliers. ( )

A. Correct

B. Error

Correct Answer: B

10. The procurement implementation plan is not only the time arrangement for the purchaser to carry out procurement activities for the procurement project, but also the comprehensive arrangement made by the purchaser for the conclusion and management of the contract around the realization of the procurement needs. ( )

A. Correct

B. Error

Correct Answer: A