laitimes

Behind the drinking water of 680,000 Macao people, there is a story "hidden"

author:Bright Net

In the last century, it was not easy for the people of Macao to use water for their daily life

Only well water and a small amount of mountain spring water can be relied upon

Macau has long suffered from water shortages

Caught in a development bottleneck

Thousands of miles of dew, wisdom to fight salty tide

With the strong support of the central government

The Mainland and Macao go hand in hand

Overcoming one water supply problem after another

Today's Macau residents turn on the tap

You can drink safe, high-quality edible water

Macao's economy is booming

It is precisely because of the continuous flow of water

In silently supporting

Let's take stock together

Important water conservancy projects that guarantee Macao's water supply

Zhuxiandong Reservoir

Behind the drinking water of 680,000 Macao people, there is a story "hidden"

March 8, 1960

The area is 0.8 square kilometers

It can hold 2.4 million cubic meters of fresh water

The Zhuxiandong Reservoir was officially completed

It is surrounded by mountains and beautiful scenery

The location is close to Macau

The terrain is also very suitable for water storage

It is a quick solution

Macau is the best choice for urgent water needs

Since then, Macau residents have sat at home

You can drink high-quality fresh water from the mainland

Xijiang sharpening door water diversion project

Behind the drinking water of 680,000 Macao people, there is a story "hidden"

In 1980, the current situation of urban construction and population growth

As a result, water consumption in Zhuhai and Macao is increasing day by day

Water supply to Australia is experiencing difficulties again

Guangdong decided to develop new water sources

-- Water diversion project through the Xijiang sharpening knife gate

The Modaomen waterway built in Zhuhai

Since then, it has become the best water intake for Zhuhai's water supply to Macao

Most of the water pumping stations are concentrated here

In 1988, the first phase of the Xijiang Knife Gate Water Diversion Project was completed

In August of the following year, the second phase of the project was completed and opened to water

It greatly guaranteed Macao's water use and development construction at that time

"West-to-East Water Diversion" project

Behind the drinking water of 680,000 Macao people, there is a story "hidden"

"West-to-East Water Diversion" project

It unites the people of Zhuhai and Macau

Determination to defeat the salty tide together

December 26, 2006

With 18 up to 10 meters high

Giant pipe jacking shafts sank into the banks of the Xijiang River

The steel dragon was successfully docked and connected with the fixed angle sluice

One-time success

Bamboo and silver water source project

Behind the drinking water of 680,000 Macao people, there is a story "hidden"

In 2011, the bamboo silver water source project was completed and put into use

The storage capacity is 43.33 million cubic meters

So far, the storage capacity of Zhuhai exceeds 100 million cubic meters

Ensure the safety of water supply in Macao and Zhuhai

Engineering systems and non-engineering measures are becoming more and more perfect

It has greatly improved the capacity of the water supply system in Zhuhai and Macao

and emergency response capabilities to water pollution emergencies

Let the people of Zhuhai and Macao be unaffected by the salty tide from now on

Article 4 Water supply pipeline project to Macao

Behind the drinking water of 680,000 Macao people, there is a story "hidden"

From Guangdong Zhuhai to Macau

Article 4 Water supply pipeline project to Macao

The water was officially opened on October 17, 2019

After the project was opened to water

Zhuhai's water supply capacity to Macao

Increased from 500,000 cubic meters per day to 700,000 cubic meters per day

At the same time, it also changed the water supply to Australia at that time

A single model of entry into Macao from the Zhuxian Cave Reservoir

A water supply line into Macau from the direction of Taipa was added

This enables a two-line water supply

It has greatly improved the ability of Macao's water supply sources to resist risks

Pinggang-Guangchang raw water supply guarantee project

Behind the drinking water of 680,000 Macao people, there is a story "hidden"

Pinggang-Guangchang raw water supply guarantee project

It is also a major water supply project for the construction of the Guangdong-Hong Kong-Macao Greater Bay Area

The project was officially opened on October 22, 2020

It makes Zhuhai have the capacity to transport water from west to east

From a maximum of 1 million tons per day to 2 million tons per day

The flexibility of water system dispatch has increased dramatically

The water supply guarantee capacity of Zhuhai and Macao has been effectively strengthened

Behind the drinking water of 680,000 Macao people, there is a story "hidden"

Looking at the more than 60 years of water supply to Australia

Increase in water supply pipes one after another

Including the continuous renovation and expansion of the project

Witness the progress of the times

It also witnessed Zhuhai and Macao

The deep friendship of drinking the water of the river together

Source: Voice of the Greater Bay Area

Read on