laitimes

A night without sleep Shouguang cadres work together to deal with "fireworks" to build a "flood wall"

author:Lightning News

Video loading...

Qilu Network Lightning News July 29, affected by typhoon "fireworks", from the evening of July 28, Shouguang City began to rain, starting from 7 p.m., Shouguang City party members and cadres, volunteers stuck to the water conservancy embankment, greenhouse planting area and urban flood-prone areas all night, so as to achieve the "four implementations" of personnel, materials, equipment, and communications, and to do a good job in the defense of heavy rainfall, strong winds and other disastrous weather brought by typhoon "fireworks" in a state of war.

At 9:20 p.m., in the western section of the Mihe Bridge in Jitai Town, Shouguang City, a staff member was on duty every 50 meters, and rescue equipment and rescue materials such as excavators, dump trucks, sandbags, etc. were readily available.

In order to ensure the safety of the Mi River, Dan River, Kwai River and other transit rivers, Shouguang City Emergency Rescue "Thousand People Standing Team", Party members and cadres and volunteers from the streets and villages along the river town from 7 o'clock to the post, each river embankment every 50 meters arranged three river patrol personnel, uninterrupted patrol. Along the river each village prepared an excavator, a dump truck. In addition, each village has prepared an emergency commando team with different numbers according to the length of the river, which can ensure an immediate response once a dangerous situation is found.

Li Hua, deputy secretary of the party committee and mayor of Daotian Town, Shouguang City, told reporters that in order to cope with the typhoon, more than 80 village cadres from 20 villages along the river all went on patrol, and set up an excavator and a dump truck full of sandbags for every 100 light poles in accordance with the requirements of the city. The town organized an emergency rescue team of 500 people in advance, prepared more than 50 excavators, forklifts, dump trucks and other machinery, and urgently mobilized two long-arm excavators from Dongying to ensure that Danhe was foolproof.

A night without sleep Shouguang cadres work together to deal with "fireworks" to build a "flood wall"

At 10:30 on the evening of the 28th, heavy rain fell in the urban area of Shouguang City, and the water inspection team of the Shouguang Municipal Housing and Construction Bureau was carrying out the task of checking at night, and conducting an uninterrupted water inspection of the main roads in the urban area.

Yu Peng, chief of the engineering section of the Shouguang Municipal Housing and Construction Bureau, told reporters that at night, he will stick to his post, keep an eye on the front line, and conduct night inspections of the water on urban roads. For sections of roads with stagnant water and silt, measures are taken to ensure that residents can travel in an orderly and safe manner.

In Shouguang District, not only can you see the mobile emergency flood control team in each area, But Shouguang Hongjian Maintenance Company has also prepared sufficient emergency flood control and drainage devices and large equipment.

Yang Jianming, secretary of the party branch and chairman of the board of directors of The Hongjian Municipal Maintenance Company in Shouguang City, told reporters that large-scale dump trucks, loaders, dredging vehicles, emergency flood control and drainage vehicles and other large-scale equipment are readily available. Once there is a flood situation, quickly rush to the scene to rescue.

Lightning News reporter Liu Bei Shou Guangrong Media Center Ding Jianguo Zhang Na Li Ning Liu Yang Weifang reported

Read on