
On October 22, the groundbreaking ceremony of the reconstruction project from Baifengling to Lizhai section of National Highway 527 (Baifengling Tunnel) was held at the entrance of Baifengling Tunnel.
The Baifengling Tunnel Project is the first section of the reconstruction project from Baifengling to Lizhai, with a total length of 745 meters, and the entire construction period is expected to be 20 months. The project is one of the key projects of the city's "five major battles" platform construction conference road network penetration action, but also an important part of the "five horizontal" one of the "five horizontal" highway network in Dongyang, the construction of the project conforms to the demolition toll station of ordinary highways (Baifengling), opens up the highway bottleneck from Dongyang to Shengzhou, will accelerate the construction of Jinhua-Dongyang metropolitan area, strengthen the need to connect Jinyi metropolitan area with Ningbo metropolitan area, make the nearby regional road network structure more perfect, traffic conversion more convenient, The connection between local roads and highways has been strengthened, and the function of trunk roads in the regional road network and the overall efficiency of the road network have been improved.
Source: Dongyang Trading Group
Editor: Jiang Zhi Zhang Li