Commitment to site specification management services

Commitment to site specification management services

  In a new era of rapid change and constant change, more and more places need to use the Letter of Commitment, which must be made during the validity period of the offer. I believe that writing a commitment letter is a headache for many people, the following is a small editor to sort out. The commitment letter of construction site standard management service welcomes everyone to learn from and refer to it, and hopes to help everyone.

  First, the siege operation. Construction sites must be fenced, the fence (fence) is strong and beautiful, clean and dust-free, the height of the main street is more than 2.5 meters, and the rest must not be less than 1.8 meters.

  Second, the road hardening. The entrance and exit roads must be hardened for more than 50 meters, and the construction roads on the construction site must be hardened.

  3. Closed construction. Above "plus or minus zero" must be closed construction and the fence is firm and beautiful.

  Fourth, rinse. Sand grit ponds and flushing ponds must be built, and facilities for flushing and dust reduction must be configured to ensure smooth drainage and sewage discharge, and there are special personnel on duty to operate.

  5. Cover transportation. Vehicles entering and leaving the construction site must keep the car clean and tidy, the cargo compartment is closed and covered, and there is no dripping and dripping, bringing mud on the road.

  Sixth, material stacking. The construction site materials are stacked in an orderly manner, the building materials that are prone to dust must be fully covered, and the functional partitions are scientific and clear to ensure that the environment is clean and hygienic.

  7. Mixed use of merchants. Commercial concrete must be used, and self-mixing is prohibited at the site. Self-built temporary mixing plants must go through the relevant procedures.

  8. Dust reduction operations. Excavation and demolition works must be sprayed, and construction abandoned soil is dumped at designated sites.

  Nine, five cards and one picture. Five cards and one map must be on the wall, the wall spray painting is clean, beautiful and undamaged; more than 3 slogans on civilized construction, dust control, safety and other aspects are hung in a standardized manner.

  10. Greening. Sites that have not been under construction for a long time, with bare land, must be temporarily greened or fully covered.

  The above ten articles, our project construction unit, construction unit solemn commitment, will be implemented. If there is a violation, or failure to do it or do a good job, voluntarily accept the county urban and rural planning and construction law enforcement bureau in accordance with the relevant provisions of the Urban and Rural Planning Law, the Provincial Regulations on the Comprehensive Management of urban and Rural Environment, the County Dust Control Measures and other laws and regulations to punish, and pursue the responsibility of the relevant directly responsible persons.

【Site Specification Management Service Commitment】Related Articles:

1. Standardized service commitment

2. Hall normative service commitment letter

3. Service etiquette norms

4. Engineering service management commitment

5. Service specification learning summary

6. Letter of commitment of "Market Channel Price Specification Management"

7. Introduction to the etiquette specifications of exhibition services

8. Convention and exhibition service etiquette specification requirements

Read on