1. EPC general contracting work at all stages of the project

The work content and document requirements of each stage of the EPC project are super detailed
The work content and document requirements of each stage of the EPC project are super detailed
The work content and document requirements of each stage of the EPC project are super detailed
The work content and document requirements of each stage of the EPC project are super detailed
The work content and document requirements of each stage of the EPC project are super detailed
The work content and document requirements of each stage of the EPC project are super detailed

2. Work requirements for each stage of the EPC project

(1) Engineering design stage requirements

(1) The design must meet the actual needs of construction, as detailed and accurate as possible; The design should listen to the opinions of the contractor, the supervisor and the construction subcontractor, improve the design, and make the project perfect.

(2) The design shall check and verify all the basic data and materials of the design, and use them after confirmation by the contractor.

(3) The design shall establish a design coordination procedure and coordinate and control the interface relationship between the professions in accordance with the provisions of the contractor on the conditions for mutual mention between the professions.

(4) The design documents prepared shall meet the requirements of the bidding documents and meet the needs of material and equipment procurement and construction.

(5) Design optimization, so that the design not only meets the functional requirements of the contractor, but also meets the rationality, economy and reliability requirements of the design.

(6) The design shall be responsible for providing procurement documents; Technical review and quality inspection during the procurement process; Perform constructability analysis and meet its requirements.

(7) The design work should be connected in an orderly manner with procurement, construction, etc. according to the design plan and handle the interface relationship.

(8) The design should communicate with the contractor to establish a design change procedure, and conscientiously perform it in the implementation to effectively control the increase in costs caused by the design change.

(9) The design plan shall meet the quality objectives and requirements agreed in the contract, the relevant quality regulations and standards, and meet the requirements of the contractor's quality policy and quality management system and related management system; Project cost control indicators and limit design indicators should be clarified; The design schedule shall meet the requirements of the total schedule of the project, fully consider the internal logical relationship of the design work, resource allocation, external constraints and other conditions, and shall be coordinated with the progress of engineering survey, procurement, construction, acceptance, etc.; The basis for setting the objectives is precise, and the implementation and reliability of the measures are ensured.

(10) The preparation of construction drawing design documents shall meet the needs of equipment and material procurement, non-standard equipment production and construction, and trial operation; The equipment materials selected for the design should indicate their models, specifications, performance, quantity, etc. in the design documents.

Its quality requirements must comply with the relevant provisions of the current standard; The depth of the construction drawing design should meet the construction requirements, and the acceptance and handover of the contractor can be carried out accordingly.

(11) Ensure the design drawing schedule and approval links at various stages agreed in the contract.

(12) Formulate investment, quality and schedule objectives in the design stage of the project; Control the total investment of the project to ensure quality and schedule.

(13) Communicate with the drawing review unit in time, improve and modify the construction drawings, pass the drawing review as soon as possible, obtain the opinions of the construction drawing approval body and obtain the certificate of conformity or the drawing review report.

(14) Organize the triage of construction drawing design, and correct errors, omissions, touches and defects in drawings.

(15) Before construction, the design should be submitted, the design intention should be explained, the design documents should be explained, and the design requirements should be clarified.

(16) The designers in the construction stage should go to the site to guide and serve, find problems and solve them in time to ensure the smooth progress of the project.

(2) Work requirements in the construction stage

(1) Procurement work requirements

(a) The quantity of the procurement plan for equipment and materials should be accurate, the implementation standards should be clear, and the delivery date should meet the requirements of the schedule.

(b) Suppliers of materials and equipment must conduct on-site inspections, and suppliers must meet the requirements of equipment, material quality and duration.

(c) The signed material and equipment procurement contract shall comply with the provisions of the procurement technical documents, and shall also clarify the supplier's on-site installation, commissioning, operation guidance and quality non-conformity.

(d) The unpacking acceptance and acceptance of equipment and materials should be strict and meticulous, and it can only be used with the approval of the supervising engineer; The acceptance record or acceptance report should be timely and complete, and the supervisor should sign and confirm it in time.

(e) The scope of material brand specified by the contractor (Party A) shall be purchased, inspected and implemented by the general contractor (Party B) within the scope of procurement.

(2) Construction process stage

(a) The main work of the construction stage is to complete the construction of earthworks, foundation works, main structure engineering, decoration projects, hydropower installation projects, outdoor road pipe networks and other municipal projects, landscape greening projects and other engineering projects, carry out construction process quality control, schedule control, change control, construction cost control, construction safety, standard chemical land management, itemization and stage acceptance management, and fully complete the construction tasks according to the required construction period.

(b) The construction documents shall be formed simultaneously with the progress of the project, and the approved sub-project commencement report, the visa acceptance of the hidden project, and the completion of the inspection and valuation data in accordance with the contract and supervision requirements.

(c) According to the design requirements and contract agreement to complete the required acceptance of the sub-project, when the intermediate acceptance conditions should be submitted, the construction unit in a timely manner to organize the general contracting unit, design unit, supervision unit to carry out intermediate acceptance, and should be in accordance with the relevant provisions of the government to notify the quality supervision agency to supervise the acceptance. After the intermediate acceptance is passed, the acceptance participants shall make a final assessment of the quality of their branch projects and sign and recognize the intermediate acceptance data.

(d) In the construction stage, strict control should be carried out on the progress of the project and the cost of the project, strengthen the control of the process and links, ensure the node duration and the total construction period, and ensure that the project investment is controlled within the budget.

(e) The designer, as the project management personnel, should go to the site to guide and serve, find problems and solve them in time to ensure the smooth progress of the project.

(3) Acceptance delivery stage requirements

(1) Completion acceptance stage requirements

Completion acceptance is the last link in the project construction process, a sign of the transfer of investment results into use, and an important step to comprehensively assess construction results, test design and project quality. The project should meet the following requirements after completion acceptance and delivery for use.

(a) Meet the conditions for completion acceptance

(i) Complete all the design of the construction project and the contents agreed in the contract, achieve the decision-making objectives, planning objectives, control objectives and completion objectives of the project, and meet the completion requirements stipulated in the contract;

(ii) have complete technical files and construction management information;

(iii) have an entry test report on the main building materials, building structure fittings and equipment used in the project;

(iv) Have quality qualification documents signed by the survey, general contracting and project supervision units;

(v) There is a project warranty signed by us.

(b) Requirements for preparation for completion and acceptance:

(i) Collation of technical data: The source, category and preservation of the project completion data shall be prepared in accordance with the requirements of the "Code for the Archiving of Construction Project Documents" (GBT 50328-2014) and the "Construction Engineering Data Management Regulations" (JGJ/T 185-2009).

(ii) Preparation of completion report: We self-assess the quality level and prepare the completion report according to the relevant national technical standards

(iii) Preparation of completion acceptance report: preparation of completion acceptance report, the general contracting unit (including various professional subcontracting units) and the supervision unit to assist in the preparation.

(c) Procedures and organizational requirements for completion acceptance

(i) The project is completed in accordance with the scope of the contract, after the acceptance of the project of each unit, in line with the design requirements, and the preparation of completion drawings, completion settlement, project summary and other necessary documents, the contractor to the unit responsible for acceptance of the completion of the application report.

(ii) Self-acceptance work: After the general contracting unit completes the design drawings and all the contents agreed in the contract, it organizes and accepts the project completion self-acceptance record report and prepares the completion report.

(iii) Application for acceptance: The supervision unit verifies the completion report and evaluates the quality level of the project. The general contracting project department shall report in writing to the construction unit to apply for acceptance, and fill in the unit (sub-unit) project completion pre-acceptance report and inspection form.

(iv) Special project acceptance: The construction unit submits planning, fire protection, environmental protection, water protection, quality and technical supervision, urban construction archives, electricity, tap water, municipal, transportation, communications, gas, gardens, termites and other relevant departments to carry out special acceptance, and according to the opinions put forward by the special acceptance department, rectification is completed, and qualified certificates or permitted documents are obtained.

(v) Initial acceptance of the project: the construction unit reviews the completion report and organizes the survey, design, general contracting and supervision to formulate the acceptance plan; Listen to the work reports of each unit and the evaluation opinions of the quality supervision department on the quality of the project; Check whether the construction work is carried out according to the approved scale, and the implementation of laws, regulations and mandatory standards for engineering construction in all aspects of the project construction; Check the appearance quality of the project and the relevant information, and identify whether the quality of the project meets the quality standards required by the design; Check the handling of the remaining problems in the previous acceptance and the problems found in the operation of the unit projects that have been put into use; Determine the list of tail work and its completion deadline and responsible unit, etc.; Evaluation of major technical issues; Inspection and review of engineering archives; Propose a date for completion acceptance; and sign the acceptance inspection record;

(vi) Acceptance supervision: Before the construction unit organizes the completion and acceptance of the project, it shall notify the project quality supervision agency in advance, and submit relevant quality documents and quality assurance materials, and the project quality supervision institution shall send personnel to supervise the acceptance work; The engineering quality supervision institution shall supervise the organizational form, procedures, the implementation of the inspection and evaluation standards and the assessment results in the acceptance work. If the acceptance is not passed, the project shall not be put into use.

(vii) Completion acceptance: presided over by the construction unit, including the participation of the government engineering quality supervision department, a comprehensive evaluation of the engineering survey, design, construction, equipment installation quality and management links, etc., and the formation of the project completion acceptance opinion signed by the experience receiving personnel.

(viii) After the completion of the project, the construction unit determines the completion date and submits the project completion acceptance certificate.

(2) Project delivery stage requirements

(a) After the completion and acceptance of the acceptance, the contractor will issue a unit (sub-unit) project acceptance certificate to us. The contractor shall be responsible for the care of the issued unit project (sub-unit) that receives the certificate. The acceptance results and conclusions of the completed project shall be annexed to the application report for the completion of all projects.

(b) Transfer of archives: After the completion and acceptance of the project, a complete set of construction project files must be handed over to the competent urban construction archives management department within the specified time. At the same time, according to the contract, the corresponding project file information is submitted to the regional supervisory unit and the contract issuer where the project is located.

(c) If the contractor agrees to accept the project after acceptance, the contractor shall issue a certificate of acceptance of the project to us within the agreed period after receiving the application report for completion and acceptance. If the contractor agrees to accept the project after acceptance but puts forward the requirements for renovation and improvement, it shall be repaired within a time limit and the certificate of acceptance of the project shall be postponed. After the completion of the renovation and improvement work, after the supervisor reviews and meets the requirements, with the consent of the contractor, the project acceptance certificate will be issued to us.

(d) If the contractor does not agree to accept the project after acceptance, the supervisor shall issue instructions according to the acceptance opinion of the contractor, and we shall organize the conscientious rework or remedial treatment of the unqualified project, and bear the resulting costs. After completing the rework or remediation work of the unqualified project, we shall resubmit the completion acceptance application report and re-carry out the completion acceptance procedure.

(e) The actual completion date of the qualified project shall be subject to the date of completion acceptance and acceptance, and shall be stated in the certificate of acceptance of the project.

(4) Quality warranty stage requirements

(1) The date of acceptance stated in the certificate of receipt by the contractor is the date on which the contractor's reporting responsibility begins and the date of the defect liability period.

(2) The warranty content and duration are in accordance with the provisions of the general contracting contract and the commitments in the "Engineering Quality Warranty". During the warranty period, our unit shall fulfill the commitments stipulated in the contract.

(3) Formulate project return visit and warranty system and incorporate it into the quality management system.

(4) The acceptance at the end of the warranty period shall be organized by the contractor (or the unit of the contractor), and the general contractor, the construction subcontractor, the supervision unit and the contractor (property) shall participate. The contractor (or the unit of the contractor) issues a certificate of acceptance of the quality warranty period of the project.

3. EPC project main file

The main documents of the project are shown in the following table:

The work content and document requirements of each stage of the EPC project are super detailed
The work content and document requirements of each stage of the EPC project are super detailed
The work content and document requirements of each stage of the EPC project are super detailed
The work content and document requirements of each stage of the EPC project are super detailed

After the holiday, concrete shipments bottomed out, and the capacity utilization rate increased by 133% month-on-month (data source: Centennial Construction Network)

The work content and document requirements of each stage of the EPC project are super detailed

The weekly shipments of concrete surveyed this week were 364,400 square meters, an increase of 208,000 square meters from the previous month, and the concrete shipments rebounded significantly. Sub-regional point of view: the seven major regions in the largest increase in shipments for the South China region, after the holiday downstream projects gradually resumed work, to a certain extent to promote the improvement of concrete market demand, so the concrete shipments rose significantly; followed by the southwest region, the inter-holiday suspension of concrete enterprises have opened their doors, shipments began to rise; in addition, the downstream procurement demand in central China has been restored, the concrete market has picked up, shipments increased by 271%; East China and North China shipments increased by 54% and 34% respectively, Mixing plant supply of key projects, inventory tight and capital pressure under the pressure of concrete shipments slowly rebounded; the northeast and northwest regions this week capacity utilization rate of 0.03% and 0%, affected by cold weather, downstream project construction is blocked, demand is still in a stagnant stage, after the holiday concrete shipments are difficult to improve in the short term.

The work content and document requirements of each stage of the EPC project are super detailed

This week, the number of rainy days in 145 cities in China increased, and the average number of rainy days affecting concrete shipments in the week was 0.5 days, a decrease of 0.5 days from the previous month. Among them, the rainfall in East China and Central China was greatly reduced by 1 day, and the southwest and South China regions were reduced by 0.7 and 0.06 days respectively, and the recent rainy weather in various regions was less affected, the weather improved and the temperature rebounded, and the concrete market gradually recovered after the holiday, and shipments began to increase steadily.

The work content and document requirements of each stage of the EPC project are super detailed

This week's survey of concrete enterprises more feedback problems have the following five points: 46% of the concrete enterprises feedback that the market demand is weak, the current downstream projects have not resumed work in a large area, most of the mixing station shipments have improved, but only a small amount of supply to key projects in a short period of time; 29% of the concrete enterprises feedback that the capital pressure still exists, the payment collection rate declines year-on-year, and now the enterprise still takes the collection as the main work, selectively guaranteeing high-quality projects; 13% of the concrete enterprises feedback that the material preparation situation is not good, and the raw material inventory is low. At present, the procurement pressure is not reduced, and the growth rate of shipments in a short period of time is limited; 8% and 4% of concrete companies feedback that due to external factors such as slow construction progress and the Holding of the Winter Olympics, there is little room for concrete shipments to temporarily recover.

The work content and document requirements of each stage of the EPC project are super detailed

The feedback from concrete enterprises in key areas is as follows:

East China region

Fujian concrete enterprise feedback: only one of the projects received has resumed work, the daily shipment volume is about 80 parties, the mixing station is not positive about the recovery of market demand this week, and it is believed that short-term market demand will slowly pick up.

Zhejiang concrete enterprise feedback: at present, normal production has resumed, but due to the small number of downstream construction projects to resume, it has not yet returned to normal levels, and the current average daily shipment is about 2,000 square meters, and it is expected to return to normal levels from the end of February to the middle of March.

Feedback from Anhui concrete enterprises: At present, it has not opened its doors for business, and there is no shipment. Tomorrow will start business, but the shipment volume in a short period of time is not large, only sporadic projects are being done in the downstream construction, on the other hand, the financial pressure still exists, and the lack of start-up funds.

Feedback from Shandong concrete enterprises: On the 16th, the company started construction, and the downstream market project started earlier, but the construction site operation was less, and it is expected that the order volume this week will not be much. In terms of payment collection, it is basically flat compared with previous years, and if the payment collection in the first quarter is less than expected, it will actively reduce the supply.

Central China region

Henan concrete enterprise feedback: in recent days, the average daily shipment of about 200 square meters, the surrounding construction sites do not start much, the current supply of prepayment customers, for the years before the poor payment of customers, temporarily do not intend to supply.

Hunan concrete enterprise feedback: at present, the mixing station has begun to operate, but the downstream project has not yet started, the mixing station has not yet shipped, it is expected that the project will start after the fifteenth of the first month, and the mixing station will immediately begin to supply.

Feedback from Hubei concrete enterprises: After the first ten years, the mixing station resumed business, and the shipment volume in recent days has been increasing, and the weekly shipment volume has not exceeded 2,000 square meters.

South China region

Guangdong concrete enterprise feedback: twelve started, has been normal shipments, the daily average of five hundred square, is expected to fully resume work around the twentieth of the first month, the poor return of funds compared to other mixing stations is acceptable, not due to financial problems should be shipped.

Feedback from Guangdong concrete enterprises: workers have basically arrived, a small number of shipments will begin tomorrow, and this week will gradually resume work, and projects with an impact on funds may not be actively supplied after years.

North China region

Feedback from Beijing concrete enterprises: At present, it has not yet opened and produced, and it is planned to resume production after the end of the Winter Olympics on the 21st. The attendance rate of concrete employees is less than 20%, and it is expected to return to work around the 20th.

Feedback from Tianjin concrete enterprises: At present, it has been operating normally, with an average daily shipment of about 200 square meters and a weekly rate of about 1200 square meters. At present, demand has not yet rebounded, and shipments are expected to increase significantly at the end of February.

Feedback from Shanxi concrete enterprises: planned to open tomorrow, no shipments this week. In the short term, the demand for concrete market is difficult, and the focus of work after the holiday is still the payment collection, and it is expected that shipments will increase significantly in mid-March.

Southwest region

Sichuan concrete enterprise feedback: In February, the downstream demand is less, the mixing station has been opened, the office staff have arrived, the downstream demand is less, the average daily shipment is only 100-200 square meters, due to the poor payment situation, the current hoarding is not much and is also stepping up the payment collection.

Yunnan concrete enterprise feedback: last week there was no order, there is no volume, this week began a small amount of goods, the daily average is expected to be 400-500 parties, market demand has not risen.

Northwest Region

Shaanxi concrete enterprise feedback: the enterprise has not started construction, is expected to resume work on February 8, but in view of the surrounding market site has not yet started, it is expected that the full production will be extended to around February 15.

Shaanxi concrete enterprise feedback: is currently in the raw material storage stage, sand plants have started, but the procurement pressure is still very large, raw material inventory is at a low level, this week sporadic project supply, the daily average of 800 square meters.

The average capacity utilization rate of concrete this week was 1.82%, which was higher than expected. Shipments increased 133% sequentially. This week, except for the northwest, shipments in other regions have rebounded, of which South China and Southwest China have the most obvious increases. The fifteenth day of the first month has passed, the construction projects have begun one after another, and it is expected that the utilization rate of concrete capacity will rebound to about 4% next week. The North China Winter Olympics have not yet ended, and it is expected that shipments in North China will have a large room for recovery.

Sample description: The current round of research time is 2.10-2.16 days, the total sample volume is 506 concrete mixing stations, the regional proportion: East China 23.28%, Central China 16.43%, South China 17.12%, North China 21.23%, Southwest 15.1%, Northwest 2.7%, Northeast 4.14%; Capacity Utilization Rate = Weekly Output / Weekly Design Capacity; The Normal Average Capacity Utilization Rate of Concrete Enterprises Remains At About 30%.