laitimes

Gree won the bid for the efficient computer room project of Guangzhou Baoying Commercial Plaza

author:HVAC home

  Recently, Gree Central Air Conditioning successfully won the bid for the efficient computer room project of Guangzhou Baoying Commercial Plaza, which is another masterpiece of Gree in the commercial sector!

Gree won the bid for the efficient computer room project of Guangzhou Baoying Commercial Plaza

  Project Introduction

  Guangzhou Baoying Commercial Plaza is located in Huangpu District, Guangzhou, which was built by Guangzhou Development Zone Investment Group Co., Ltd. with an investment of 350 million yuan, with a total construction area of 49,000 square meters and a building height of 99 meters. After the completion of the project, it will become a landmark building in the free trade zone, and the preferred place for catering, entertainment, leisure and socializing for the masses in the western district of guangzhou free trade zone and the western area of the development zone, adding a touch of color to the beautiful Guangzhou.

Gree won the bid for the efficient computer room project of Guangzhou Baoying Commercial Plaza

  Efficient solutions

  The project is large in scale, the air conditioning cooling time is long, and the customer has put forward strict requirements for the comfort, energy saving, stability and reliability of the air conditioning system, and the degree of automation.

  Through year-round load simulation, optimization of equipment selection, operation strategy design, adjustment tracking optimization, data monitoring expert diagnosis, Gree Central Air Conditioning has created a set of efficient computer room solutions tailored for the Guangzhou Baoying Commercial Plaza project. High standards and refinements are carried out at every step of the project to ensure the overall energy efficiency of the refrigeration room EER≥ 5.0 (w/w). Compared with conventional computer rooms, the energy saving rate is 40%, and it is expected to save more than 600,000 yuan in operating costs per year.

  The high-efficiency refrigeration machine room, the main equipment has been optimized, using 2 sets of 500RT permanent magnet synchronous frequency conversion centrifugal units and 2 sets of 200RT permanent magnet synchronous frequency conversion screw unit for cooling; 3 sets of 130KW air-cooled heat pump units in the summer with cold peak period for cooling, winter heating; 3 sets of 80KW air energy hot water units to provide a matching scheme for domestic hot water throughout the year. The operation strategy can be automatically adjusted according to the load demand of the commercial square, ensuring that the refrigeration machine room runs in the high efficiency range at different load rates, and the energy saving effect is better.

Gree won the bid for the efficient computer room project of Guangzhou Baoying Commercial Plaza
Gree won the bid for the efficient computer room project of Guangzhou Baoying Commercial Plaza

Gree permanent magnet synchronous frequency conversion screw chiller

  Let the commercial complex fall in love with Gree Manufacturing

  In recent years, Gree Central Air Conditioning has been focusing on providing professional and all-round HVAC system solutions for the commercial complex industry, accumulating rich practical experience and model engineering. It has successively served commercial complex projects such as Beijing China Zun, Nanjing Financial City Phase II, Foshan Zhongying Shengda International Finance Building, Xiamen Yinglan International Finance Center, Changsha Shijing International Plaza, Wuhan Yangtze River Media Building, Shenzhen Jinli Building and so on. With excellent product quality and advanced and efficient system solutions, Gree is opening up a new situation in the commercial complex market.