According to the "Concrete Structure Engineering Construction Quality Acceptance Specification" GB50204-2015, the main control project of the reinforcement project is ()
A. The connection method of the stressed reinforcement
B. Mechanical properties of steel reinforcement
C. Weight deviation of the reinforcement
D. Deviation of installation spacing of rebar
D