laitimes

"I must have lived in a new house a few years ago!"

author:Great River Network

□ He Ke, a reporter for Henan Daily, and Xi Xuhong, a correspondent of this newspaper

On the morning of December 7, Zhang Yuqi, a group of villagers in Wentang Village, Xinzhong Town, Gongyi City, was delivering materials to the decoration master. Looking at the clean floor, white walls, and neat ceiling buckles in the kitchen, Zhang Yuqi showed a happy smile. The reconstruction of the house after the disaster not only changed the dilapidated scene of his family in the past, but also boosted his confidence to work hard in the future.

Zhang Yuqi's family of 5 originally lived in a courtyard with gray tiles, and the "7.20" rainstorm damaged his family's house. "I really didn't expect to get the key to the new house so soon, no, the floor of my house is almost paved, and I must have lived in a new house a few years ago!" Zhang Yuqi's joy overflowed into words.

In the process of rural housing transformation and post-disaster reconstruction, Gongyi City resolutely implements the work arrangements of the province and Zhengzhou City, regards the post-disaster reconstruction of farmhouses as the "No. 1 project" and "people's heart project" of the current work, and on the basis of ensuring quality, truly highlights a "fast" word. At present, 100% of the repair and reinforcement of 7307 houses have been completed; in the process of decentralized resettlement, 532 farmhouses involved in the reconstruction of the original site have all started; and a total of 49 projects have been identified for centralized resettlement, involving 13 towns (streets), and all construction has been started.

In order to accelerate the relocation and resettlement of the disaster-stricken people, Gongyi City has implemented measures according to local conditions and classification. Using the existing housing for centralized resettlement, Xinzhong Town has used 370 sets of affordable housing to resettle the disaster-stricken masses, and 72 households have been resettled; 252 sets of housing in the real estate with problems in the Panhuohe Coal Industry in Dayugou Town have been resettled by the disaster-stricken masses, and the project of rectification and upgrading is currently being carried out; and the resettlement of potential housing resources has been excavated, and Mihe Town has used the first phase of the resettlement area in the township area to resettle the disaster-stricken people on the basis of ensuring the housing of the original demolished households.

In view of the temporary difficulties of the masses, Gongyi City coordinated financial institutions to customize the "reconstruction loan" with a quota of less than 50,000 yuan, a 1-year period, pure credit issuance, and a government discount before the completion and delivery of the building, as well as a "resettlement loan" with a quota of 200,000 yuan, a 10-year period and a low interest rate to reduce the pressure on the masses to buy houses. For the resettlement of centralized buildings, after the demolition of dangerous houses, they can continue to retain the right to qualify for homestead land, or hand over the homestead to the village for collective use and enjoy the share dividend. Timely distribution of transitional relief funds, the launch of the "warm heart through the winter" special action, to solve the problems of clothing, food, housing and warmth, so that the disaster-stricken people can truly feel the warmth of the party and the government.

Strictly control the quality of newly built housing, Gongyi City preferentially select enterprises with strong strength, high qualifications, sufficient funds, good performance and good reputation to participate in post-disaster reconstruction. Set up a project quality supervision team to control the quality and safety of the reconstruction project in the whole process. Strictly control the safety of funds, discipline inspection, finance, auditing and other departments participate in the whole process of subsidy object confirmation, fund allocation, project construction, completion acceptance and other links, the whole process of supervision of the safe use of disaster relief funds. Strictly control the price of resettlement housing, under the premise of ensuring quality and safety, try to control costs as much as possible, so that the masses can live in economic housing, safe housing, and comfortable housing.