On the evening of November 1, Zong Zhenhua, secretary of the Changli County Party Committee of Qinhuangdao County, Di Sha, deputy secretary of the county party committee and county governor, and Li Feng, deputy county governor, led the main responsible comrades of the county housing construction and other relevant departments to investigate the central heating work in the county.
In November, the temperature plummeted, Changli County entered the heating season in advance, with a strong concern for the masses, on the evening of November 1, Zong Zhenhua, Di Sha, li feng successively went to changli County National Energy Biomass Power Plant, No. 1 Heat Source Plant, Yongjian Heat Company, and talked cordially with the responsible persons of relevant departments and duty staff, learned more about the supply of biomass raw materials, the overall situation of the construction of the heating pipe network, and checked the operation of the unit, the maintenance of equipment pipelines, the spot check table of heating conditions, and the safety production.
Zong Zhenhua, Di Sha, and Li Feng came to the Times Heavenly City and Li Chang Shangfu Community, walked into the homes of the masses, carefully measured and checked the indoor temperature, and talked cordially with the masses to inquire about the heating situation in detail.
Zong Zhenhua pointed out that winter heating is related to thousands of households, involves the vital interests of the masses, and is an important people's livelihood project. Relevant departments should comprehensively check the heating situation in the community and residents' homes, and conduct real-time dynamic monitoring and careful inspection of heating enterprises, heating stations, pipe networks, and households to ensure that the temperature meets the standards.
Heat departments should strengthen the management of heat supply operation, grasp key links such as equipment maintenance and pipeline protection, establish an emergency prevention mechanism for heat supply, and timely discover and eliminate potential safety hazards。 It is necessary to do a good job in the procurement of raw materials in the context of rising coal, and under the premise of ensuring the safe and stable operation of heating facilities, we should do everything possible to improve the quality and efficiency of heating, so as to achieve timely, high-quality and safe heating.
Zong Zhenhua stressed that the winter central heating is related to the vital interests of the citizens, heating companies should strengthen monitoring and regulation, do a good job in the daily maintenance of the pipe network, improve the emergency plan, focus on improving the ability to deal with emergencies, extreme weather capabilities and emergency disposal, do a good job in operation and maintenance, repair services and emergency repairs, timely acceptance, disposal, feedback on the heating problems reflected by the masses, and at the same time strengthen environmental awareness, combine winter heating and air pollution prevention and control, discharge in strict accordance with environmental protection standards, and create a good ecological environment for the masses. (Zhang Yushu)
Source: Changli Release
Pay attention to Hebei News Network to learn about the latest news in Hebei.