laitimes

Carry forward the glorious tradition and fight a new battle (struggle for a hundred years, set sail for a new journey, keep in mind the original mission, and strive for greater glory)

author:People's Daily News

Source: People's Daily - People's Daily

The grass is lush, the rivers and lakes are green, the derricks are towering, and the drilling rigs are roaring. In a wetland far from the urban area of Daqing City, Heilongjiang Province, the 1205 drilling team of Daqing Oilfield Drilling Engineering Company Drilling Company II is opening up a new battlefield.

The 1205 drilling team, which is the team led by "Iron Man" Wang Jinxi, has accumulated 3.16 million meters in the past 68 years, which is equivalent to drilling through more than 350 Mount Everest, and is known as the "steel drilling team".

"I'd rather live twenty years less, and desperately want to win the big oil field..." Behind the derrick is a mobile team history museum of the 1205 drilling team, and the captain Zhang Jingzheng is leading cadres and workers to relive the "iron man" Zhengzheng oath.

On July 1, Zhang Jing listened to General Secretary Xi Jinping's important speech in Beijing's Tiananmen Square. "The Party Central Committee calls on us to strive for greater glory for the party and the people, and we must not lie down on the book of merit and sleep, but must keep firmly in mind our original mission and continue to struggle hard." Zhang Jing said.

Duan Yongjian, secretary of the party branch of the drilling team, also encouraged everyone: "From 2017 to 2020, we created a record of 100,000 meters of drilling for 4 consecutive years. This time, we took the initiative to ask for battle and took the lead in advancing into the new battlefield of deep horizontal well drilling, that is, we must always plant the red flag on the mountain peak. ”

"New topics, new challenges, there are many difficulties, and the difficulty is not small." Party member Li Haiyang said, "The party branch dispatched technical backbones to form a party member technical research team, repeatedly explored, and mastered the operation of the 70db large drilling rig and the deep well drilling technology that can drill 7,000 meters deep in 40 days." ”

"Here the lithology is fragile, easy to collapse, easy to leak, easy to drill, it is indeed a hard bone to gnaw." Li Haixin, a driller, said, "We broke through the conventional construction operation method, increased the density of drilling fluid through the ladder, solved the problem of easy spalling of the formation, and successively set a record of 33.1 days, 28.7 days and 22.63 days for the drilling cycle of deep horizontal wells." ”

Although the project is progressing smoothly, Zhang Jing still reminds everyone: "We have successfully delivered 3 wells, and the fourth and fifth wells are in the three-opening drilling stage." There are still some blind spots in the post regulations, which cannot be careless. ”

"Our mechanical shift is on duty 24 hours a day, combined with the operation and maintenance needs of large drilling rigs, we have preliminarily sorted out 67 items and 482 key parts, and determined the well site inspection route of 17 posts." The repair and construction of the mechanical class, the skin is tanned and shiny, but the work on the hands is very thin.

Speaking of a thousand and ten thousand, the key is to roll up the sleeves and work hard, Zhang Jing put forward requirements for the next step: "By exploring the application of new equipment and new processes, find out the shortcomings and deficiencies, strive to break through the 22-day record of the drilling cycle, continue to optimize the lean drilling production model, and accelerate the transformation of drilling from experience-based and speed-based to efficiency-oriented and scientific-technological." ”

"After graduation, I came from the city to the oil fields and worked in the field. A lot of people ask me if I'm worth it, and I say of course it's worth it!" Less than a year after the 23-year-old Zhao Kunpeng joined the work, he has mastered the technical operation specifications of all 7 positions in the team, "shouldering the major responsibility of being a good benchmark banner and building a century-old oil field, we must all be brave and compete for the lead." ”

Unconsciously, the sky darkened, the roar of the drilling rig, and the slogan "Iron Man Team Always Forward" at the height of the derrick stood up to the wind. The oath is silent, not to forget yesterday, not to live up to tomorrow.

People's Daily ( 2021-07-17 04 edition)

Read on