laitimes

The intersection is changed from the southern half of the road Yangliuqing Road is about to connect to the expressway in the north

Last night, after the intersection of Runyang Expressway and Yangliuqing Road in Yangzhou City completed the paving of the southern half of the grass-roots asphalt, traffic was opened, and the northern half of the original traffic began to be closed for construction. It is planned that in early December, the road junction will resume normal traffic after all construction has been completed, and the road north of the intersection will also be completed and connected to the expressway that has been opened to traffic.

That night, the reporter saw at the construction site that the vehicles passed in an orderly manner from the southern half of the intersection, and the newly paved road was very smooth. After the northern half was closed, the construction personnel immediately put into the road surface transformation to ensure that the intersection resumed normal traffic as soon as possible. In order to ensure quality and aesthetics, the southern half is only paved with grassroots asphalt, and after the northern half of the grassroots asphalt is paved, the surface layer of asphalt at the entire intersection will be paved together. (Correspondent Yuan Sen Reporter Jiang Chuangang)

Read on