Recently, the new Zhongwei to Lanzhou Railway Lanzhou New District South Station Comprehensive Hub Hub Square Project Square Inner Ring Road Squeezed Pile Project officially began construction, as an important node in the construction progress of the project, in order to cooperate with the Lanzhou New District South Station on schedule, while doing a good job in epidemic prevention and control, the project department deployed and planned in advance, and actively communicated with the construction, design and supervision units during the construction period, and the project is progressing smoothly.
It is understood that the inner ring road of the square belongs to the auxiliary project of the comprehensive hub distribution square of the new Zhongwei to Lanzhou Railway Lanzhou New District South Station, the inner ring road is in the shape of a "U", and the two ends are connected to the South Ring Expressway. The total length of the road is 700.348m, and the width of the road is 20m, 17m and 18.5m, respectively. The design speed is 20km/h. Construction includes: roads, rainwater, lighting, traffic and ancillary works. The inner ring road squeezed piles in the square are 3:7 ash soil squeezed piles, the average pile length is divided into 6m and 15m, and the inner ring road squeezed piles in the square are 15212, with a total pile length of 124086m, a pile diameter of 40cm, and a pile center spacing of 100cm, which is arranged in a triangle or plum shape.
Faced with the severe epidemic prevention and control situation, during the construction of the project, in strict accordance with the requirements of the "Lanzhou New District Urban Construction Engineering Co., Ltd. Guidelines for the Prevention and Control of the New Crown Pneumonia Epidemic", the project department launched the "New Crown Pneumonia Epidemic Prevention and Control Plan", conducted a comprehensive inspection of the labor service personnel of the project, established a "one person, one file" health file, handed over the epidemic prevention measures, fully implemented the epidemic prevention responsibility, strictly abided by the epidemic prevention and control requirements, and carried out the construction content step by step.
It is reported that after the completion of the road, it will further improve the supporting auxiliary projects of the South Railway Station Square in the new district, promote the construction of urban supporting facilities, drive the land development and appreciation of the area, beautify the urban environment, and improve the level of economic development of the surrounding areas. In addition to the construction of the square in front of the station, the infrastructure of the South Station of Lanzhou New District of the Zhonglan Special Line is also being comprehensively improved. In the future, the South Railway Station of the New District will become a regional comprehensive three-dimensional transportation hub integrating railways, railways, buses, taxis, long-distance passenger transport, private cars and other modes of transportation.
Lanzhou Daily all-media reporter Zhang Jianping text / photo
Editor 丨Sun Yue
Responsible editor 丨 Zhang Yajun
The duty director 丨 Guo Junyu
Source: ZAKER Daily Lanzhou
Statement: This article has indicated the source of the reprint, if there is any infringement, please contact us to delete! Contact email: [email protected]