laitimes

Subcontracted pit

The company's construction site has a new subcontract, which needs to be replaced with a lot of materials, and I do not agree, because the price of the materials is not close, and it has been delayed for a few days. I see that I can't delay the construction period because of this manufacturer, I agreed to change the manufacturer, this manufacturer promised me some benefits before working, I directly told the general contractor to change the manufacturer I will lose a lot, he directly said let me say a number, all the materials in the future do not need me to manage, they find their own manufacturers. At first I refused, and then I kept looking for me, and I agreed. I said the number, he told the company leader directly, the leader asked him to show the evidence, he said to take it out in minutes, and now it is just a verbal promise. When he came to me for the amount, he said it casually, and there was no time to record. My direct supervisor asked me if I had any questions, and I directly said that there was, and he wanted to give it to me, not what I wanted. The leader is a relative of mine, and I directly said that I can completely deny this, because he cannot come up with evidence, and I admit it because I don't want to lie to you. The leader asked me what to do in the future, he will give you money again, I directly said that I have a brain disease before I want it again. The leader told me not to be silent, just pretend that nothing happened, don't turn my face to the subcontractor, and the leader will come over in a few days. Now the leader is considering transferring me away, I am ready to leave, I am thinking about how to find something for the general contractor after I leave, can not let him be too comfortable, there is no good suggestion