
The picture shows Li Jiexiang, member of the Standing Committee of the Qinghai Provincial Party Committee and executive vice governor of the provincial government, announcing the start of construction. Photo by Sun Rui
Qinghai Gonghe, China, October 15 (Reporter Sun Rui) On the 15th, China's large-scale wind power photovoltaic base Qinghai Hainan and Haixi base projects began construction.
According to reports, strong light, strong wind, less precipitation, large evaporation, etc. are the main causes of deserts, Gobi and deserts, so deserts, Gobi and desert areas are essentially also areas rich in wind and solar energy resources in China. Qinghai has significant advantages in clean energy resources, with a theoretically exploitable amount of photovoltaic resources of 3.5 billion kilowatts, ranking first in China, and the cost of photovoltaic power generation is the lowest in China; the exploitable amount of wind energy technology is 75.55 million kilowatts, ranking the forefront of China, especially the potential for low-wind wind power development is huge; and the desertification land resources that can be used for clean energy development reach more than 100,000 square kilometers。
The picture shows the scene of the UAV aerial photography groundbreaking ceremony. Photo by Sun Rui
Che Junping, deputy director of the Qinghai Provincial Development and Reform Commission and director of the Provincial Energy Bureau, said at the groundbreaking ceremony, "The first batch of large-scale wind power photovoltaic base projects in the country arranged for the construction of 10.9 million kilowatts of new energy in our province at one time, which is unprecedented in the history of Qinghai's energy development." These projects are mainly distributed in the Areas of Gonghe, Xinghai and Haixi Prefecture in Hainan Prefecture, Utu Meiren, Mangya, Delingha and Dachaidan, and these projects will release direct investment of more than 65 billion yuan (RMB) in the next two years. ”
The picture shows the scene of the groundbreaking ceremony. Photo by Sun Rui
"Since the 13th Five-Year Plan, Haixi Prefecture has vigorously cultivated and developed new energy industries by relying on the abundant solar, wind and desertification land resources in the Qaidam Basin. At present, the state's new energy grid-connected installed capacity of 10.96 million kilowatts, under construction installed capacity of 1.68 million kilowatts, clean energy accounted for 91% of the total installed power capacity, has been fully built the first 10 million kilowatts of new energy industry base, has become one of the main battlefields of Qinghai Province to build a clean energy demonstration province. Lu Dan, vice governor of Haixi State Government, said that a total of 10 projects with 4.5 million kilowatts landed this time, and the whole state will continue to promote the new energy industry to a higher stage of development, and strive to transform the advantages of the new energy industry into a traction force for multi-field and multi-dimensional economic and social development. (End)
Source: China News Network