laitimes

The Beijing Subway released the latest schedule of the last train during the construction of the sound barrier of line 1 batong line and Changping line

author:Beiqing hot spot
The Beijing Subway released the latest schedule of the last train during the construction of the sound barrier of line 1 batong line and Changping line

On October 26, according to the Beijing Metro Company, in order to minimize the impact on passenger travel caused by the early termination of the operation of the bayonet line and the changping line sound barrier construction section of Line 1, the subway company further optimized the last train time of the line that ended operation early on the basis of ensuring the safety of operation and construction.

1. From October 26, 2021 to December 15, 2021, the operation of the Guanzhuang to GuoyuanYuan district of Line 1 Batong Line will end in advance, and the two sections from gucheng to Guanzhuang and from Orchard to Universal Resort will be operated in two sections during this period. The last bus from Gucheng Station of Line 1 to Universal Resort Station is adjusted from 19:46 to 20:11, the last bus time from Sihui Station to Universal Resort Station is adjusted from 20:35 to 21:00, the last bus from Universal Resort Station to Gucheng Station is adjusted from 20:32 to 21:03, and the last train time of other stations is also optimized accordingly.

The Beijing Subway released the latest schedule of the last train during the construction of the sound barrier of line 1 batong line and Changping line

2. From October 26, 2021 to December 15, 2021, the section from Zhuxinzhuang to Shahe Higher Education Park on the Changping Line will end its operation in advance, and the two sections from Xi'erqi to Zhuxinzhuang and from Shahe Higher Education Park to Changping Xishankou will be operated in two sections during this period. The last bus from Xi'erqi Station to Xishankou Station on the Changping Line was adjusted from 21:39 to 22:00, and the last bus from Changping Xishankou Station to Xi'erqi Station was adjusted from 21:33 to 21:53, and the last train time of other stations was also optimized accordingly.

3. In view of the early end of operation of the Guanzhuang to Guoyuanyuan section of Line 1 Batong Line, guide passengers to travel on Line 6 and Line 7, especially for the extended opening hours of Universal Resort City Avenue on Friday and Saturday, from October 22, both sides of Line 7 will extend the operating time to each station by 1 hour, and the departure time of the last train of Line 7 Universal Resort Station will be extended from 22:30 to 23:30.

4. Beijing Metro Corporation further strengthens the contact and docking mechanism with the local transportation bureau and bus group, increases the number and capacity of ground bus and subway connection, and provides more connection guarantee services for passengers.

The Beijing Subway released the latest schedule of the last train during the construction of the sound barrier of line 1 batong line and Changping line

First, during the early termination of operation of some sections of Metro Line 1, passengers can choose to transfer to Bus No. 342 and No. 582 at Tongzhou Beiguan Station of Metro Line 6, transfer to Bus No. 372 at Wansheng East Station of Metro Line 7, transfer to Bus No. 647, No. 668, No. 806 and No. 807 at Guomao Station of Metro Line 10, and transfer to Bus No. 322 at Sihui Station of Metro Line 1 to Tongzhou District.

Second, during the early end of operation of some sections of the Changping Line, passengers can choose to take Metro Line 2 and Line 10 to transfer to Bus No. 345, No. 345 Express and No. 670 to Changping District.

The subway company will further strengthen publicity and guidance through station notices, station bus broadcasts, official websites, official microblogs, official WeChat public accounts, official APP, news media and other channels to further strengthen publicity and guidance, and prompt passengers to plan their travel paths and times in advance. During the ride, if you need help, you can call the Beijing Subway service hotline 96165 in time.

Text/Beijing Youth Daily reporter Liu Yang

Editor/Peng Zhang

Read on