laitimes

The fourth joint meeting of the river chief system work in 2021 was held in Yudu County

author:Released by Yudu Water Conservancy

The fourth joint meeting of the river chief system work in 2021 was held in Yudu County

On October 13, according to the requirements of the river chief system, the fourth joint meeting of the river chief system was held in Yudu County. Li Heng, director of the county water conservancy bureau and executive deputy director of the county river chief office, presided over the meeting and dispatched the key work of the river chief system, and the leaders and business personnel in charge of 14 county-level river chief system responsible units attended the meeting.

The meeting conveyed and studied the spirit of the sixth party congress of the city and the twentieth party congress of the county, required all responsible units to effectively strengthen the protection and management of rivers and lakes, fully promote the continuous deepening of the river chief system, and make arrangements for the supervision of the second city river chief system, the health evaluation of rivers and lakes, and the year-end provincial and municipal river chief system work assessment to ensure that the responsibility for the river chief system is fully implemented.

The meeting stressed that all responsible units should strengthen industry supervision and joint law enforcement. River and lake governance is a systematic project, the river chief system work is not the work of the water conservancy family, it is necessary to strengthen coordination and cooperation between various departments, to establish the concept of overall pollution control, to implement the source of heavy governance, water and land co-governance, and jointly do a good job in the work of river and lake governance.

The meeting demanded that, first, we should continue to carry out the "Qinghe Action" and the special rectification of the "Qingsi Chaos" of rivers and lakes on a regular basis, further grasp the ten major actions for the construction of the Poyang Lake Basin, comprehensively carry out the investigation of river-related problems, and solve prominent problems; The second is to attach importance to the docking with provincial and municipal departments, closely follow the assessment indicators of the river chief system, find the work gap, and improve the daily work around the indicators; The third is to study and implement the spirit of the county's cadre work style construction conference, check and fill in the gaps around the current river chief system work, keep an eye on the time node, and come up with excellent measures to ensure that all the tasks of the river chief system are completed with high quality and efficiency.

Read on