At 18:07 on October 26, with the smooth grid connection of Unit 1 after the overhaul, the two units of Huaneng Zuoquan Power Plant were all running online, opening the "strongest mode" of power and heat preservation.
In the face of the current severe situation of power and heat supply, Huaneng Zuoquan Power Plant conscientiously implements the spirit of the Huaneng Group Company and the Shanxi Branch Electric Power And Heat Supply Work Conference and the Fourth Quarter Work Conference, holds several special meetings on power and heat supply, studies and deploys the power plant's power and heat preservation work this winter and next spring, and resolutely shoulders the political responsibility for power and heat safety and supply. In order to solve the urgent need to burn "coal", the power plant set up a supply leading group for the first time, the general manager personally took command, careful deployment, and actively communicated and coordinated with the governments at all levels and the Energy Bureau in Shanxi Province, closely tracked the changes in the fuel market, negotiated with multiple parties, rationally transferred, and gave full play to the role of the "ballast stone" of the long-term plan, tried every means to ensure supply, worked hard to stabilize inventory, and reduced costs with a thousand words, and has signed a contract for "guaranteed coal" of about 400,000 tons, and the supplier has taken the lead in reducing the coal price by up to 150 yuan / ton. It has laid a solid foundation for ensuring supply and price control, and reached the intention of continuous supply of coal in the follow-up.
At the same time, the power plant deepens the hidden danger investigation and management of heating equipment, heating pipe network and other systems, strengthens the frequency and intensity of inspection of unit equipment, and effectively improves the maintenance and fine management level of the unit, so that the unit is always in a safe and reliable operating condition. Since October 20, the power plant has been centrally heating the county seat of Zuoquan County, and the current power supply and heat supply are stable, which strongly demonstrates the mission of the central enterprises.
Xue Lin Wu Jianwei Fan Xianze
(Editor-in-charge: Ma Yunmei)