
On the afternoon of September 24, Lin Qiang, deputy secretary of the municipal party committee and mayor, went to the new urban area and the new railway area to supervise the key projects of urban construction. Lin Jianmin, member of the Standing Committee of the Municipal Party Committee, participated in the inspection.
On the same day, Lin Qiang and his party inspected the Chengdong Complex, the Eastern Section of Hengfeng Avenue, the Comprehensive Transportation Hub of the Railway New Area and the Prodigy Gate Cultural Park to understand the progress of the project construction and the problems encountered in its advancement.
With a total land area of 98,071 square meters and a total construction area of 288,029.91 square meters, the Chengdong complex project will be built into a shopping mall and high-end residences, and the project started construction in July, and 30% of the pile foundation construction has been completed.
The Hengfeng Avenue project is west to Zhonghua North Road and east to Wanchang North Road, with a total length of about 2700 meters, a width of 50 meters, and a planned total land area of about 230 mu. The road is designed in accordance with the city's main road Level II standard, which is a two-way six-lane road, and 4 new bridges are planned, which are scheduled to be completed by the end of 2022. At present, the eastern section of Hengfeng Avenue has completed 60% of the engineering volume of the No. 4 Bridge, and the roadbed is 1.2 kilometers.
The comprehensive transportation hub of the new railway area started construction on October 20, 2018, with a total land area of about 115 mu and a total construction area of about 108,800 square meters, mainly including four sub-projects of the East Square Hub Project, the Rail Transit Supporting Housing Project, the Bus Interchange Center Project and the Hub Parking Building Project. At present, the overall project has completed 80% of the total project volume.
Prodigy Gate Cultural Park is located in Shentongmen Village, Chengxi Street, with a total construction area of 28,512 square meters, and the park is equipped with a children's playground, public toilets at the station, green seedlings, landscape lighting, and Zhenjiefang. At present, the project is undergoing the installation of human scene sculpture and children's playground facilities, and is scheduled to be completed in November.
Lin Qiang stressed during the inspection that the key projects of urban construction are related to the improvement of urban energy levels and the vital interests of the masses, and are an important starting point for improving the appearance of the city and improving the livability and workability of the city. All relevant departments and towns (streets) should effectively enhance the sense of urgency and mission, keep an eye on the time node, reverse the construction schedule, go all out to promote the construction of key projects, and promote the high-quality development of the city with high-quality project construction. At the same time, it is necessary to coordinate and solve all kinds of problems encountered in the promotion of work, strictly control the quality of the project, and ensure that the project is completed as soon as possible and the masses benefit as soon as possible.
(Source: Wenling Municipal People's Government website) [Submissions, regional cooperation, please send a private message or send a 3469887933 #qq.com within 24 hours to reply. 】