laitimes

The sewage discharge of the swimming pool was blocked, and the competent department raised funds to renovate the pipe network

Yangtze River Daily Wuhan client october 26 news "Thanks to the relevant departments for the enterprise to solve the problem, we finally do not have to send people to pump sewage." On the 26th, the person in charge of the National Fitness Center of HanjiangWan Sports Park told a troublesome matter that has plagued the enterprise for a long time, which was recently resolved by the government department, and could not help but praise the "shop small two" spirit of the staff of the Water Affairs and Lake Bureau of Qiaokou District.

The sewage discharge of the swimming pool was blocked, and the competent department raised funds to renovate the pipe network

The representative of the National Fitness Center of Hanjiangwan Sports Park thanked the Water and Lake Bureau of Qiaokou District for solving the problems. Photo by correspondent Qu Mengling

According to the person in charge of the center, there are two standard swimming pools in the Hanjiangwan Sports Park, which are operated and managed by the Hanjiangwan Sports Park National Fitness Center. In line with environmental requirements, in 2018, the center blocked the sewage outlet of the swimming pool flowing into the Han River, and instead pumped the sewage into the municipal pipe network for discharge. However, the person in charge of the enterprise then found that the sewage discharge of the swimming pool was not smooth, and there was often a reverse flow phenomenon, especially in the rainy season, the amount of rain increased, and it was necessary to send more people to pump the sewage with a pump. This not only affects the normal operation of the swimming pool, but also hinders the public environment of the park, which is also a big burden for enterprises. The person in charge reflected on this issue at a symposium on optimizing the business environment.

After the staff of the Qiaokou District Water Affairs and Lake Bureau learned about it, they immediately invited the Wuhan Flood Control Survey and Design Institute to the site to investigate, find the cause of the problem, and formulate a transformation design plan as soon as possible. "If we don't solve the problem of drainage obstruction in time, the swimming pool will not be able to open to the public normally."

Zhao Xialin, a relevant staff member, told the Yangtze River Daily reporter that in order to minimize the damage to the park pavement, reduce the impact on the citizens' visit to the park, and also save the cost of transformation, they have changed the plan three times, and finally formed the best design plan for the transformation of the drainage pipe network.

The sewage discharge of the swimming pool was blocked, and the competent department raised funds to renovate the pipe network

After the transformation of the drainage pipe network of the national fitness center of the National Fitness Center in HanjiangWan Sports Park, the swimming training for the benefit of the people was carried out normally. Photo by correspondent Qu Mengling

At the same time, the Qiaokou District Water and Lake Bureau has also actively tried to raise funds for the renovation, coordinated with the property management unit of the park, and rationally arranged the renovation from the daily maintenance funds of the river beach.

Nowadays, the renovation project of the drainage pipe network of the swimming pool of the national fitness center of the Hanjiangwan Sports Park has been completed, and the swimming pool has been drained smoothly and put into normal operation.

(Yangtze River Daily reporter Wan Ling, correspondent Zhan Ou, Zhang Jian, Qu Mengling, intern Xie Hua)

【Editor: Hu Zhihao】

For more exciting content, please download the "Greater Wuhan" client in major application markets.

Read on