
In order to give better play to the role of people's congress deputies and promote the implementation of various practical things that benefit the people, the people's congress of Linjiang Town insists on making good use of the carrier of the theme of "Beautiful Haimen • The Most Beautiful Deputies", fully combines activities such as "I do practical things for the masses" and "grass-roots research and problem solving month", and innovates the "three integration" supervision model, that is, the integration of deputies' supervision and contact with voters, the integration of on-site research and special inquiries, the integration of leading practical matters and supervising projects, and effectively solving the people's livelihood problems that the masses have strongly complained about. Further promote the effective implementation of the eight major people's livelihood practical projects in Linjiang Town, and continuously enhance the people's sense of happiness and gain.
On September 17, the People's Congress of Linjiang Town organized the third quarter representative group activity and the activity of contacting voters with deputies around the theme of "solving problems strongly reflected by the masses and promoting practical projects for people's livelihood", and deputies at the district and town levels, some voter representatives of various villages, and responsible persons of relevant government departments and lines participated in the activities. The people's congress of Linjiang Town has actively explored and innovated the way of activities, combining the activities of linking voters with inspection activities, and extending the place of receiving voters from the "home of people's congress deputies" to the front line of inspection. Organize voters to participate in inspection and supervision, special inquiries, listening to special reports, and other links, listen to the opinions and suggestions of deputies and voters, and give full play to the greatest effectiveness of deputies in connecting with voters, paying attention to people's livelihood, concentrating people's wisdom, and reflecting public opinion.
"There are too many flies this year, and the doors can't be opened, which has seriously affected the daily life of ordinary people." Since June this year, villagers in Yuanju Village have reacted strongly to the problem of fly infestation. After investigation, due to the two earthworm breeding enterprises under the jurisdiction of Daoxiang Village, chicken manure is used as earthworm feed, resulting in serious flies and insects in the surrounding areas, affecting the normal life of the surrounding people and even the villagers in neighboring villages. "Secretary Lu, what measures have been taken in your village to solve this problem?" Yuan Jianfei, deputy to the Yuanju Village People's Congress, and Pang Jiahuan, a voter, jointly asked Questions to Lu Hongbo, secretary of the general party branch of Daoxiang Village. Daoxiang Village and Yuanju Village take the initiative, pay attention to both symptoms and root causes, the first time for the affected villagers to provide free sticky fly paper, spraying potion to kill flies, and actively communicate with relevant enterprises, agree on a remediation plan, requiring enterprises to immediately stop the transport of chicken manure, use other feed instead, and completely remove the chicken manure site. At present, all rectifications have been completed.
"Why build an ecological river? How to build? "How far is this project going now, and when will it be completed?" Lu Pei, a deputy to the town people's congress, threw an inquiry to Chen Xiaxi, deputy director of the Linjiang Town Water Conservancy Station, who was the person in charge of the project. To create the Twenty Kuang River ecological river project is one of the eight people's livelihood projects in Linjiang Town, after nearly two years of treatment, the water quality of the Twenty Kuang River is good, but some of the river slopes have landslide problems, to create a "clear water, green shore, smooth river, beautiful scenery" ecological river will greatly enhance the rural water environment, become a good place for the people to relax, entertain and fish. The Twenty-Kuang River is a tertiary river in Linjiang New Area, starting from the No. 11 Henghe River in the north to the Yunshui River in the south, with a total length of about 3 kilometers, flowing through the three administrative villages of Xisheng, Pumin and Yangying. The form of wooden pile + concrete pile structure is used for revetment, the river channel is dredged and dredged, and the river slope is planted with greenery. The entire project investment of about 12 million yuan, the current prefabricated pile has been 700 piles, the completion of 3600 prefabricated piles, the main project will be completed by the end of November.
The People's Congress of Linjiang Town insists on promoting the simultaneous advancement of practical affairs for the people's office and supervising the people's livelihood, establishing a dynamic database of practical matters led by representatives of village residences, deputies regularly reporting on the progress of practical matters, determining the representatives responsible for supervising and handling practical projects of people's livelihood with the representative team as the unit, carrying out targeted and accurate supervision, giving play to the advantages of the deputies themselves, and promoting the solution of a number of problems that the masses are anxious and anxious about. In this group of deputies, the deputies of the village people's congresses reported to the town people's congress and the voters in both directions on the progress of leading the handling of 18 practical matters and their plans for the next stage, and implemented their supervision responsibilities by inspecting the site of the people's livelihood practical projects, listening to the peasants' housing construction certificates, and special reports on traffic safety transformation work, and promoted government departments to speed up the construction of the project and ensure the quality of the project.
Since the beginning of this year, traffic accidents have occurred frequently in the jurisdiction of Linjiang Town, the masses have reacted strongly, and the reconstruction of traffic safety facilities is imminent. The Linjiang Town Construction Bureau coordinated the transformation of traffic safety facilities in the parking lot of the town convenience service center, the county road lighting project, the construction and maintenance project of the nonglusion bridge on the nonglusion road, the renovation project of the continuous "Y" type road intersection south of the Baolin Highway, and the safety environment improvement work of the main traffic trunk line, and made a special report. This year, 24 accident-prone intersections in Linjiang Town were paved with red and blue colored roads to enhance the warning effect of vehicles slowing down; at the two important intersections of Pingzhong Road, the "Mutual Warning System for Intersections without Signal Lights" and smart glowing floor tiles were installed; and 4 groups of traffic lights and 8 groups of pedestrian light plates were installed at the intersection of Linjiang Avenue and DongtingHu Road. Advance in an orderly manner and comprehensively improve the traffic safety index of the new area.
According to the requirements of the Standing Committee of the Haimen District People's Congress, the People's Congress of Linjiang Town conducted special supervision over the work of handling certificates for peasants' housing construction and listened to special reports. According to statistics, there are 17,614 cases of real estate registration in Linjiang Town that should be registered for the integration of rural real estate, and the data collection of 17 villages in the town has been completed in May, and the inspection and verification of maps has been carried out in June, and the leakage has been checked and filled. At present, a total of 16,190 cases of data have been preliminarily collected in the town, and the number of cases that meet the conditions after preliminary screening is 11,837, and the number of cases that require third-level confirmation is 5,073. However, due to the large population base and the large number of problems left over from history, the speed of progress is slower. In the next stage, the functional departments will continue to adhere to the overall planning and take into account the quantity and quality of the certificates, increase the intensity of dispute mediation, so that it should be issued early and should be issued, and ensure that the registration task of the whole town is successfully completed within the specified time.
(Source: Haimen District People's Government website) [Submissions, regional cooperation, please send a private message or send a 3613378752 #qq.com within 24 hours to reply. 】