Pay attention to detours
From September 26
Shunyi District will be right
Shunmi Road (south of Baima Road to north of Weijiadian)
Carry out overhaul works
It is scheduled to be completed by November 15
At that time
The appearance of this section of the road
will be further improved
The overhaul project of Shunmi Road (south of Baima Road to north of Weijiadian) is a highway maintenance project of the Municipal Transportation Commission in 2024, with a total length of 8 kilometers from the south of Baima Road in the south to the north of Weijiadian in the north. The main content of the project is road milling, disease treatment, pavement repair, etc.
Shunmi Road.
As an important traffic artery in Shunyi District, Shunmi Road carries a large number of vehicles and people, and the current roadway surface structure has produced serious diseases such as large-scale network cracks and potholes, which have potential traffic safety hazards and bring inconvenience to citizens. To this end, the Shunyi Highway Branch implemented this overhaul, which will further improve the road service level and extend the service life of the road.
Detour signs have been installed on the surrounding roads.
At present, a number of roads along the route and intersecting roads have been equipped with detour signs, construction reminders and warning signs. "During the construction period, the public can bypass the surrounding roads such as Zuodi Road, Limu Road, Beihan Road, and Tonghuai Road (the northern section of Changjin Road)." Cao Song, deputy chief of the engineering section of the Shunyi Highway Branch, introduced.
Before the start of the project, the Shunyi Highway Branch has visited the village communities, merchants and public service units around the construction area to explain the construction plan and guide route. During the construction period, the Shunyi Highway Branch will reasonably arrange the construction plan, adopt the implementation plan of off-peak construction and night construction, and increase traffic diversion efforts to minimize the impact of construction on traffic.
Shun Shun tips
Please plan and arrange your trip in advance, and please forgive me for the inconvenience caused by the construction. If you have any questions, you can always call us.
Shunyi Highway Branch Tel: 69461669
Telephone number of the person in charge of the site: 13520303676
Source: Beijing
Author: Beijing Shunyi official release