Pingluozhou high-speed railway is Henan Province
The first high-speed railway built by a sole proprietorship
It has both road network and intercity functions
It starts from Pingdingshan West Station in the west
East to Zhoukou East Station
The design speed is 350 km/h
The new main line is about 199.7 kilometers
It's active service and integration
"The Belt and Road" and "The Rise of Central China"
"Ecological Protection and High-quality Development of the Yellow River Basin"
and other important support of multiple national strategies and transportation infrastructure guarantee
It is an important liaison channel of the national "eight vertical and eight horizontal" high-speed railway
The continental bridge corridor branch line Nanjing via Pingdingshan
An important part of the section to Luoyang
The project team strictly implements the requirements of the "first article system".
Organized and convened construction special meetings for many times
Optimize the construction plan
Allocate resources appropriately
Strictly control the installation of bearings, formwork trials, and steel bar binding
Concrete quality control and other key processes
Ensure that the pouring process is tightly connected and the quality is reliable
For the characteristics of high temperatures in summer
The project strictly implements high temperature prevention measures
Concrete pouring is carried out by night construction
Safety, quality, technology, and test personnel track the whole process
All-round guarantee of construction safety and controllability, project quality standards
Steadily promote the construction of the project