In order to implement the requirements of the superior on the investigation and management of hidden dangers of river-related bridges, on August 6, Jingyang management section acted quickly, Wang Xiaohe led the team, and organized technical personnel to first carry out the "investigation of potential safety hazards of wading bridges" on the Kouzhen Bridge under the custody of the bridge, focusing on the inspection of the bridge cover beam, cover beam beam plate, bridge deck system, guardrail, pier column, and bridge deck drainage facilities, etc., and the bridge is currently under construction and remediation.
At the same time, the other 10 bridges under maintenance and management were gradually investigated for potential safety hazards to ensure the safe operation of the bridges. The leaders of the section required that the production unit should do a good job in the daily inspection records of the bridge, fill in the ledger in a timely manner and report it to ensure the safe operation of the bridge.
In the next step, the Jingyang management section will continue to conduct a comprehensive investigation of the maintenance bridge, so that no bridge is missed during the investigation process to ensure the safe operation of the maintenance bridge. (Yao Xin)
Editor-in-charge: Ma Ruiqin
Editor: Liu Xin