Due to the need to carry out disease control construction on the provincial highway 218 Yangxian to Huayang Highway Guanling and Niuling tunnels, it was decided to implement traffic control on the two tunnels, during which the construction section of the tunnel was single-width traffic, and the relevant matters are hereby notified as follows:
1. Traffic control time
July 13, 2024 to August 12, 2024.
2. Traffic control sections
(一)省道218洋县至华阳公路贯岭隧道洋县至华阳方向K22+950-K22+989处,K23+189-K23+280处右侧。
(2) Provincial Highway 218 Yangxian to Huayang Highway Niuling Tunnel according to the location of disease control, the implementation of single-width traffic.
3. Please consciously obey the command and guidance of the public security traffic police, road administration and on-site traffic management personnel on the traffic control section, pay close attention to the traffic signs and signs along the route, and consciously maintain traffic order.
Notice is hereby given.
Yangxian Transportation Bureau
Traffic Police Brigade of Yangxian County Public Security Bureau
July 12, 2024
Move your little hands and go after liking
——END——
(It may not be reproduced or used in any way without permission)
Source: Yangxian Transportation Bureau Traffic Police Brigade of Yangxian Public Security Bureau
Editor: Zhou Wei Editor: He Long
Review: Zhang Xiaofeng Editor-in-Chief: Zhang Zhigang Producer: Song Hao
Submission email: [email protected]
Mainstream public opinion position, integrated service platform, community information hub
Yangxian release
Aiyang County APP