Loading...
[x]
Player version
Player FPS
Video type
Video url
Video resolution
Video duration
On July 10, at the construction site of Qilu Avenue north of Jiqi Road in Jinan City, the box girder between the pile foundations of multiple sections has been poured, and the viaduct across the Jiguang Expressway has taken shape.
It is understood that the northern extension of Qilu Avenue crosses Meili Road, North Taipinghe North Road, Jiguang Expressway, passes through the east of Zhengjiadian Village, and intersects with the current G309 after crossing the Yellow River. Among them, a bid section starts from the current Jiqi Road in the south, and intersects with the South Siphon Trunk Canal Road, the North Siphon Trunk Canal Road, Wujiabao Road, Zhihuang Road and Planning Road to the north, and crosses the South Branch of the Taiping River, the North Branch of the Taiping River, the North Branch of the Taiping River, the North Meili Road, and the Jiguang Expressway in the form of an elevated highway, and lands in front of the Meili Lake Road, and a pair of auxiliary roads are set on both sides of the viaduct to realize the conversion of the traffic flow direction, and the end point is connected to the approach bridge of the Yellow River Bridge, with a total length of 3671.89 meters.