Analysis of the unit price of pipeline labor for water conservancy and hydropower projects in 2024

1. Lay concrete socket pipe pipes

1. Diameter 300mm: 35 yuan/m

Laying a concrete socket pipe with a diameter of 300mm is 35 yuan per meter.

2. Diameter 600mm: 50 yuan/m

The concrete socket pipe with a diameter of 600mm is laid, and the unit price of labor per meter is 50 yuan.

3. Diameter 900mm: 90 yuan/m

The concrete socket pipe with a diameter of 900mm is laid, and the unit price of labor per meter is 90 yuan.

Analysis of the unit price of pipeline labor for water conservancy and hydropower projects in 2024

4. Diameter 1200mm: 150 yuan/m

The concrete socket pipe with a diameter of 1200mm is laid, and the unit price of labor per meter is 150 yuan.

5. Diameter 1500mm: 180 yuan/m

The concrete socket pipe with a diameter of 1500mm is laid, and the unit price of labor per meter is 180 yuan.

6. Diameter 1800mm: 240 yuan/m

The concrete socket pipe with a diameter of 1800mm is laid, and the unit price of labor per meter is 240 yuan.

7. Diameter 2000mm: 310 yuan/m

The concrete socket pipe with a diameter of 2000mm is laid, and the unit price of labor per meter is 310 yuan.

Analysis of the unit price of pipeline labor for water conservancy and hydropower projects in 2024

8. Diameter 2400mm: 420 yuan/m

The concrete socket pipe with a diameter of 2400mm is laid, and the unit price of labor per meter is 420 yuan.

2. DN100 directional drilling construction (pipe drawing): 180 yuan/m

DN100 specification directional drilling construction, that is, pipe drawing operation, the unit price of labor per meter is 180 yuan.

3. DN200 directional drilling construction (pipe drawing): 300 yuan/m

For DN200 directional drilling construction, the unit price of labor per meter is 300 yuan.

4. DN300 directional drilling construction (pipe drawing): 420 yuan/m

For DN300 directional drilling construction, the unit price per meter is 420 yuan.

Analysis of the unit price of pipeline labor for water conservancy and hydropower projects in 2024

The above is the unit price analysis of pipeline labor services for water conservancy and hydropower projects in 2024, and the price varies according to the diameter of the pipeline and the technical difficulty of construction. During the actual construction process, the specific unit price may vary depending on the change of region, material and labor costs.