On July 5, the Shouguang Meteorological Bureau issued an orange warning for heavy rainfall, and the streets of the Holy City quickly launched the flood control emergency plan with the sound of rain as the whistle.
Early deployment and comprehensive consolidation of flood control responsibilities
On the basis of the preliminary investigation, further increase the intensity of inspections, and strictly implement the "1+1+N" multiple support mechanism of 1 organ cadre + 1 village (community) grid member + N enterprise leaders in 27 waterlogged-prone road sections, 70 waterlogging points, 13 underground shopping malls and office building underground garages, and 23 construction sites in the urban area, and do a good job of emergency preparations such as suspension, evacuation, vehicle clearance, and item clearance at any time.
Act quickly to comprehensively improve flood prevention and emergency response capabilities
Three teams were formed. Establish an emergency rescue team of 2,400 people as the overall emergency rescue force; Each village and community has set up a regular inspection team to conduct high-density inspections of villages along the river and flood-prone points in urban areas; At the same time, each village has set up a combat readiness and rescue team of 20 to 50 people in light of the actual situation, which is on standby 24 hours a day to ensure that it can be pulled out, rushed, and won at any time. Complete flood control materials. The two material warehouses in the street are fully equipped with flood control materials such as sandbags, ton bags, sand, steel pipes, and iron wires, as well as flood control machinery reserves such as generators, pumps, and assault boats, and are equipped with sandbags, excavators, dump trucks and other flood control materials and machinery in 7 key flood control areas and villages along the river; The 45 flood-prone communities, 121 basement communities, and 311 entrances and exits in urban communities are all equipped with water retaining plates, so that it is better to be prepared than to use, and unavailable to be unprepared.
Strictly implement and comprehensively refine the "three mechanisms" of flood control
Establish an information early warning mechanism, implement a special person to be responsible, use more than 900 WeChat groups to convey early warning information at the first time, and arrange work deployment at the first time. Establish a wartime readiness mechanism, strictly enforce the system of leading cadres leading shifts, and personnel on duty are on duty 24 hours a day. Establish a closed-loop work mechanism, and all grids in accordance with the principle of "who supports, who is responsible", comprehensively sort out all links in the grid, such as work priorities, personnel and materials, the number of residents, special groups, the location of resettlement sites, the capacity of resettlement sites, and transfer routes, so as to make the final count clear, the situation clear, the response is fast, and the disposal is accurate.
In the next step, the streets of the holy city will pay close attention to weather changes, strengthen forecasting and early warning, fully implement the responsibility into the interlocking flood control chain, and make every effort to support the "safety umbrella" of urban flood control.