Binhai New Area Rail Transit Line Z4
New news again!
7 stations, 6 sections, 32 kilometers of rail,
Trains and stations are unveiled
TOD project design completion, bidding, etc
A few days ago, the first electric bus of the first phase of the Z4 line of rail transit was successfully launched at the central fishing port station, and the first completed section of the project gradually entered the stage of EMU commissioning and joint commissioning and joint test, which took a key step towards the high-quality and high-standard opening and operation of the Z4 line project.
Rail transit Z4 line in series
Beitang Ancient Town, TEDA Aircraft Carrier Theme Park, Ganluxi Park, etc
Multiple cultural tourism destinations
Build an aircraft carrier park station, an elevated characteristic station, etc
It is in line with the characteristics of traffic space
It is also a high-quality station space that reflects the cultural attributes of the region
The interior space of the station was unveiled
A few days ago, Hu Hao, deputy secretary of the Party Committee and general manager of TEDA Holdings, led a team to investigate the PPP project of the first phase of the rail transit line Z4 line of TEDA Holdings' key construction project, focusing on listening to the detailed report of the project leader on the construction site of the elevated standard station of Hang'an Road Station and the model section of the elevated characteristic station of Aircraft Carrier Park Station.
He emphasized that the subway station is an important window to show the image of the city, and the decoration project of the public area of the station should not only pay attention to the overall effect, but also do a good job in the quality of details, and create a high-quality station space that not only conforms to the characteristics of the traffic space, but also reflects the regional humanistic attributes.
A few days ago, the rail transit Z4 line
From the central fishing port station to the north bank of the Yongding New River, there are 7 stations and 6 sections
A total of 32 kilometers of double lines have been "rail connected"
For the later stage of the "Dentsu" and "joint debugging and joint test"
The smooth development of work has laid a solid foundation
Recently, the TOD project on top of TEDA station
Substantial progress has been made
The bidding for the project design has been completed
Proceed to the detailed design phase
TOD project on top of TEDA station
The total construction area of the TOD project above TEDA Station is about 78,200 square meters, with an above-ground construction area of about 60,200 square meters and an underground construction area of about 18,000 square meters. As the first TOD project in Binhai New Area, the project not only integrates transportation, commerce, affordable rental housing and other multi-functions, but also pays more attention to the integration with the surrounding environment to create a new urban space suitable for living and working. The smooth implementation of the project will provide the citizens of Bincheng City with convenient rail transit, perfect functions and first-class services for quality life, inject new vitality into regional transportation construction and urban development, and inject new impetus into regional economic and social development.
Source: TEDA Urban Railway, China Railway 12th Bureau Group No. 4 Company