laitimes

Which of the two pure new projects in the new area is better?

author:Longjiang property market

Recently, the new area has finally released a new project.

There are two plots of land with new plans,

They are Galaxy One and Diamond Bay Phase III.

Which of the two pure new projects in the new area is better?

Galaxy One was won by Hualang Real Estate.

Which of the two pure new projects in the new area is better?

The total land area is 55,000 square meters,

The buildings are mainly western-style houses and small high-rise buildings.

1# and 2# are 6 floors, 5# is 7 floors, 6# is 8 floors, a total of 4 houses;

3#, 4#, 7#-13# are all small high-rise buildings with 10 floors.

There are a total of 13 residential buildings, which are arranged in a rowning pattern with high north and low south.

The floor area ratio is 1.2, which should be mainly aimed at improving the customer base.

Which of the two pure new projects in the new area is better?

The total construction area is 83,577.58 square meters, of which the above-ground construction area is 66,094.91 square meters and the underground construction area is 17,482.67 square meters.

There are a total of 488 parking spaces, 122 above ground and 366 underground.

The commercial construction area is 1712.96 square meters, with rich supporting facilities, with pension service rooms, community service stations, etc.

The surrounding transportation is convenient, close to Sunac Park.

The project is a pure bungalow community and is for quality improvement.

Which of the two pure new projects in the new area is better?

At the same time, Diamond Bay also launched three phases of the project, which were divided into two phases: A and B.

The project was acquired by Yi Teng Housing Development Group.

Which of the two pure new projects in the new area is better?

The total land area is 210,000 square meters, and the plot ratio is 2.

The project is dominated by high-rise and small high-rise.

Area B includes 1#-15#, and Area A includes 16#-33#.

1#, 2#, 16#, 17#, 21#, 22# are 26 layers,

3#-5# is 21 layers,

6# and 20# are 23 layers,

7# is 19 layers,

8#, 10#, 14#, 23#-25# are 18 layers,

9#, 12#, 13#, 27# are 10 layers,

11#, 29#-33# are 11 layers,

19# is 15 layers,

26# and 28# are 17 layers,

15# is a 10-storey and 9-storey townhouse,

18# is an 11-storey and 10-storey townhouse.

There are a total of 33 residential buildings, and the overall layout is northwest-southeast.

Which of the two pure new projects in the new area is better?

The total construction area is 555,137.78 square meters, of which the above-ground construction area is 420,590.98 square meters and the underground construction area is 134,546.8 square meters.

There are 3,249 residential households, with an average construction area of 121.91 square meters per household.

There are a total of 3,601 parking spaces, 157 above ground and 3,444 underground.

The public building area is 24,516.38 square meters, equipped with cultural activity stations, kindergartens, community hospitals and other service facilities.

Which of the two pure new projects in the new area is better?

The new projects for sale in the vicinity of the two disks are China Resources Land Yuefu Phase II, with an average reference price of 12,000 yuan/㎡.

Overall,

The geographical conditions of Galaxy One are better than those of Diamond Bay Phase III, which is a pure western-style residential area with high quality;

Diamond Bay Phase III is an improved community with a large plot area and large space for garden planning.

This year, new projects in Songbei are frequent,

Which one are you more optimistic about?