laitimes

The seventh inspection team of the city prevention refers to inspecting the flood control work in Dongli District

author:Tianjin emergency
The seventh inspection team of the city prevention refers to inspecting the flood control work in Dongli District
The seventh inspection team of the city prevention refers to inspecting the flood control work in Dongli District

On May 15, Comrade Wang Yong, deputy director of the Municipal Emergency Management Bureau and first-class inspector, led the seventh inspection team of the Municipal Prevention and Control Department to Dongli District to inspect and guide the flood control work. Comrade Lian Xin, deputy head of the district, and responsible comrades of the District Flood Control Office, the District Emergency Bureau, the District Water Affairs Bureau, the District Transportation Management Bureau, the Dongli Branch of the Public Security Bureau and Xinli Street accompanied the inspection. The inspection team listened to the report on the flood control work in our district, and inspected the rectification of the "23.7" river basin flood problem, the implementation of responsibilities, the construction of the project, the material reserve, the revision of the plan, the rescue team, and the training and drill, and inspected the flood control material warehouse, the Jingshan Railway Tunnel on Tahai Road, and the Fengjingjiayuan community on the spot.

The inspection team fully affirmed the flood prevention and preparedness work in our region and stressed: First, it is necessary to profoundly understand the extreme importance of flood prevention work. It is necessary to do a good job in this year's flood prevention work as a political task to thoroughly implement the spirit of General Secretary Xi Jinping's important instructions on flood prevention and drought control, disaster prevention, mitigation and relief work and the spirit of General Secretary Xi Jinping's important speech on inspecting Tianjin. Second, it is necessary to further consolidate the responsibility for flood control, the key is that the main responsibility of the grassroots units should be implemented in detail, especially the front-line responsible persons at the grassroots level such as community secretaries, grid members, and "gong chiefs" must be sober-minded, have clear tasks, and clear responsibilities; Third, it is necessary to implement the reserve of flood control materials, build a strong adjustable and adjustable rescue team, find out the bottom number, clarify the personnel, and ensure that the key moments are transferred and used.

In the next step, Dongli District will further check and fill in the gaps, consolidate responsibilities, implement material reserves and rescue teams, refine and optimize the plan to organize flood control publicity, training and drills, continue to carry out supervision and inspection, and comprehensively do a good job in flood control.

Source: Toray Emergency Management

The seventh inspection team of the city prevention refers to inspecting the flood control work in Dongli District

Editor/Producer: Yin Yueming

Reviewer: Zhu Xinkai

Review: Liu Chunxiang

The seventh inspection team of the city prevention refers to inspecting the flood control work in Dongli District
The seventh inspection team of the city prevention refers to inspecting the flood control work in Dongli District
Job

Read on