The construction standard construction period model of the school project of China Construction Eighth Bureau 2022 is available for download
author:Architectural engineering information
This material is exclusive to permanent members, due to space limitations, only the first part is displayed, if you need the original version, you need to join the member to obtain. Please reply in the dialog box: VIP! Learn more about the Electromechanical World Lifetime Membership Service.
Table of contents:
1. Purpose
2. Scope of application
3. Preparation instructions
Fourth, the process implementation requirements
5. Calculation table
Sixth, the process flow combing
7. Key points of special management and control
8. Process interspersed model
9. Special acceptance
10. Application of technology
......
This material is exclusive to permanent members, due to space limitations, only the first part is displayed, if you need the original version, you need to join the member to obtain. Please reply in the dialog box: VIP! Learn more about the Electromechanical World Lifetime Membership Service.
Electronic Enthusiast Network Report (Text/Li Wanwan) In the past year or so, large-scale model technology and application have been developing rapidly. Whether it's OpenAI, Google, or Baidu, Tencent, Byte...