Good news!
Longfeng Avenue
It will be fully opened to traffic at the end of May
recently
The construction site of the Hufeng Mountain Tunnel
Workers are backfilling the roof of the hole
The main body in the tunnel has been completed
Railing welding is also progressing at the same time
The section from the Maternal and Child Health Hospital to the section of Heping Road
The laying of the oil circuit was completed
Longfeng Avenue
It starts from Liaoyuan North Road and passes through Wusheng Road
Continue north to Heping Road
It contains the Lion's Peak Tunnel and the Tiger Peak Mountain Tunnel
The total length of the road is 3.076 km, and the width of the road is 24 m
It is a two-way four-lane vehicle with a design speed of 30km/h
It is a secondary trunk road for the city
After the whole section of the project is opened to traffic
From Tongzi Sports Center to Tongzi No. 1 Middle School
It only takes more than 10 minutes to drive normally
It will effectively alleviate the traffic pressure in the old town and the riverside boulevard
It is more convenient for the masses to travel
(Reporter: Wang Hongya)