laitimes

The maintenance and renovation project of the 12 trunk canals of solid expansion undertaken by the Ningbo Industrial Bureau successfully passed the acceptance of the branch project

author:The economy is big

On May 13, the construction of the 12 trunk canal maintenance and renovation projects of the Guhai Expansion Irrigation and Water Lifting Renovation Project undertaken by Ningxia Water Conservancy and Hydropower Engineering Bureau Company and the 6 branch projects of the 2nd bid section of the maintenance and reconstruction project of the water outlet tower and the outlet aqueduct of the 1st, 4th, 5th, 9th and 10th pumping stations successfully passed the acceptance.

The maintenance and renovation project of the 12 trunk canals of solid expansion undertaken by the Ningbo Industrial Bureau successfully passed the acceptance of the branch project

The project is divided into 1 unit project, 6 sub-projects and 182 unit projects. The acceptance working group inspected the quality of the project entity on the spot, carefully consulted the project archives, held a special meeting to listen carefully to the report on the construction of the project of the participating units, and agreed that the six branch projects were implemented in strict accordance with the design drawings and the requirements of the construction unit, and the construction process was scientific and standardized, and the construction data were complete and complete, and agreed to pass the acceptance of the six branch projects. It was determined that the self-assessment quality level of the outwater aqueduct and outlet tower maintenance and renovation division of the first and fifth pumping stations was qualified, and the self-assessment quality grade of the anti-corrosion treatment division project outside the current status of the pipeline and outlet tower of the pumping station pipeline and outlet tower was excellent.

The maintenance and renovation project of the 12 trunk canals of solid expansion undertaken by the Ningbo Industrial Bureau successfully passed the acceptance of the branch project
The maintenance and renovation project of the 12 trunk canals of solid expansion undertaken by the Ningbo Industrial Bureau successfully passed the acceptance of the branch project

The successful acceptance marks a solid step towards the full completion of the project, and next, the project department will continue to keep an eye on the remaining task list, go all out, make persistent efforts, and win the decisive battle to win the target task.

Source: Ningxia Water Conservancy and Hydropower Engineering Bureau Co., Ltd

Read on