laitimes

Chemical technician year-end summary sample

author:Template template sample assistant
Chemical technician year-end summary sample

Chemical technician year-end summary sample article 1

  In 20xx, this is an extraordinary year, since then I officially entered the polymerization and drying branch of XX Group Chemical Plant, and began to become an industrial worker in the real sense. For me, who has just left school and is new to the world, everything is so curious and new. Now half a year has passed in a flash, and I have become a regular employee here, contributing to the normal operation of production. The following is a summary of the work of the past six months and a plan for next year's work.

  1. Learning

  It's completely different here from school, and when we were students, we could know a little bit about it, but it definitely wasn't okay here. The main purpose of learning in school is to prepare for exams, and you can not understand it very well, but you have to remember because you have to fill it in on the exam paper to get a score. And here, you must achieve 100% understanding that any operation problem is related to production, safety and even life, and there can be no mistakes. The duration of the study was three months, during which I learned a lot. Under the guidance and guidance of the master, I learned a lot of new things, including theoretical knowledge, process flow, and the use and working principle of the equipment, which made up for the half-understood knowledge in school. The most important thing is to teach me a lot of knowledge that I can't learn in school - practical operation, which is the biggest gain of my walk. I got to know a variety of different valves, different types of centrifugal pumps, the working principle of water ring compressors, field and remote pressure gauges, level gauges, thermometers. Understand the key equipment and inspection precautions for compressing posts, which are precious.

  Safety is related to one's own and others' lives and property, safety knowledge is like a decoction, there is a disease to cure, no disease to prevent oneself, this is the most important. I learned the three no-harms, equipment maintenance bans, hot operation bans, and the use of personal safety protective equipment.

  At the same time, I also understood a truth - "there are mountains outside the mountains, and there are people outside the people", so we should not be satisfied with the status quo, we should always spur ourselves to work hard and continue to learn new knowledge, so as not to rest on our laurels. Ask the master for advice, their experience is the most valuable knowledge. It also helps me to improve my own ability, exercise my all-round ability, and make me more confident in myself.

  Second, the work aspect

  You have to work hard and don't be lazy, so that you can learn more and improve your experience accumulation. In more than half a year at the branch, I experienced two major shutdowns and maintenance, which was the best opportunity to understand the internal structure of the equipment. The first time was as a trainee, I was assigned to clean the workshop, although I missed the opportunity to learn, but obeyed the arrangement and listened to the command, and we completed the task just as well. The second time, as a compression officer, I followed this class to be responsible for adding blind plates and eliminating leaks, during which I once again consolidated my understanding of screws and gaskets, and was able to master the nominal diameter and nominal pressure of the mat, as well as the transformation of different units. At the same time, I know that the tight screws must be used evenly to ensure that there is no leakage. Just in time to clean up the polymerization kettle, there is also a chance to enter the kettle and take a look. All in all, I learned a lot from this overhaul.

  3. Work plan for next year

  With full enthusiasm for work, I will meet the unknown challenges ahead, and make plans for next year's work in order to produce more smoothly next year.

  Under the leadership of the squad leader, we will do our best to ensure the normal operation of the equipment in our posts, do not affect the production, and at the same time increase the output within the allowable range. In order to realize this plan, I will carefully inspect and observe the equipment in my future work, and more effectively see, listen, touch and smell, find problems in time and deal with them as soon as possible. Better cooperation with the central control, increase the output within the allowable range, and produce safely and smoothly. At the same time, we will continue to learn, improve our job knowledge and strive to learn new positions, so as to achieve "one will be three".

  Fourth, the final summary

  Habits are always formed inadvertently, and habits do not disappear inadvertently. When it becomes a habit to endure loneliness, we will face that little light in the dark and go all the way; When kindness becomes a habit, you will feel that the world is truly full of love. When serious work becomes a habit, we are able to do our work better and complete production.

Chemical technician year-end summary sample article 2

  Since April 1, 20xx to the Corps Construction Engineering one-click integrity branch of the Agricultural University Project Department to participate in the work, this year, has been in the project department as a technician, through the practice of the project site exercise, thanks to the project department leaders care and training and colleagues enthusiastic help, earnest teaching, so that my work has been rapidly improved, I have gradually grown into a qualified technician. I would like to thank the company for their trust in me and the support of my colleagues, through the joint efforts of the team, I have found out a certain amount of work experience.

  Key Responsibilities:

  Responsible for the preparation of the reinforcement material plan and the quality and quantity acceptance of the incoming reinforcement.

  Responsible for the lofting of rebars, the disclosure of rebar work and the inspection and acceptance of rebar engineering.

  Responsible for weather records, construction surveys and pay-offs, concealment time of reinforcement projects and concrete pouring records.

  Responsible for the measurement of each sub-item of the final accounts.

  Participate in the labor management of on-site reinforcement, formwork, civil engineering, scaffolding workers and each team, as well as other work arranged by the leader.

  Work experience

  Being able to do a good job is a prerequisite for doing a good job, which requires us to have a solid professional foundation.

  The success or failure of a project depends on teamwork, doing a project requires close cooperation of multiple departments, only the whole team to overcome all the difficulties in front of them, the formation of a joint force, will have a strong combat effectiveness, in order to achieve one victory after another in the fierce market competition!

  Be diligent in your work, work seriously, take the initiative to communicate, and avoid information lag.

  In terms of technology and management, both hands must be grasped, and both hands must be ruthless!

Chemical technician year-end summary sample article 3

  Over the past year, under the correct leadership and help of the company's leaders, and with the care and support of colleagues, we have made continuous efforts in study and work, improved and improved our ideological understanding, work ability and comprehensive ability in all aspects, and completed various tasks in the work well. Although they will go through some difficulties, they are all great opportunities for me to exercise. I feel like I have a deeper understanding of what I do. I would like to summarize my work over the past year as follows.

  First, it is necessary to strengthen theoretical study and improve personal quality

  As a technician, you must have specialized skills if you want to do your job. This year, I conscientiously participated in various learning and activities to continuously strengthen my theoretical knowledge and learn new industry norms. Yes, as a young' employee, I would be careless at work. Opinions and suggestions came, and I accepted them with humility. Hold yourself to the higher of the curve and try to tell yourself to think carefully about how you can do it better from a different perspective.

  Second, work hard and try to do your job well

  In 20xx, he was engaged in forklift technology, and in the second half of the year, he made materials with the manager. Strictly implement the company's rules and regulations in the work, pay attention to safe production, conscientiously perform the responsibilities of employees, and conscientiously implement the work arranged by the leadership. In my work, I will humbly learn from the strengths of others, always be strict with myself, and do things without any restrictions. After work, I often sit down with experienced colleagues to discuss and exchange experiences and discuss the problems found in the work. Through discussions among my colleagues, I can gain a lot of knowledge from them that I can't learn from books, which is the essence of their years of practical work. In the process, I learned a lot of work skills.

  Third, the content of the work

  In 20xx, he worked as a technician, mainly responsible for measuring and setting off, construction according to drawings and other on-site technical problems, checking whether the construction meets the requirements of the specification, proposing modifications and amendments to the problematic places, and cooperating with the work of the company's teams. It is very important to assist the company's leaders in the settlement of the project in the later stage. I will personally go to the site to measure every item assigned by the leader to ensure the accuracy of the data.

  In 20xx, the leader transferred me to the company to assist the manager in doing data, which was very challenging for me because I had been doing technology before, and I didn't know much about data. At the beginning, I made some simple electronic documents, and then began to do the modification of inspection batches, the sorting and binding of drawings, the application and approval of procedures, and had a profound study of the materials.

  Deficiencies and prospects

  I know that I still have a lot of shortcomings, such as lack of experience, and I need to improve my theoretical level. In the future, I will continue to improve myself and strive to achieve the following:

  1. Consciously strengthen learning, learn from professional theoretical knowledge, learn from colleagues around you, learn from each other's strengths, and gradually improve your theoretical level and practical ability.

  2. Strictly abide by the company's rules and regulations, unite colleagues, and complete the tasks assigned by the leaders on time.

  In short, the state of mind determines the state, and the state determines success or failure! Be responsible for the company, be persistent in your work, be enthusiastic about your colleagues, and have confidence in yourself! Be the best version of yourself! The above is a summary of my work this year. Ask the leader to criticize and correct. I hope to grow rapidly next year and make greater contributions to the company!

Chemical technician year-end summary sample article 4

  My name is that in July 20xx, I successfully passed the college entrance examination and was admitted to the Department of Geological Engineering. He graduated in June 20xx, joined the work in September of the same year, and was assigned to work in the branch of Western Mining Co., Ltd., which has been a year since then. In this short year, under the help and leadership of the company's leaders and colleagues, in accordance with the requirements of job responsibilities and code of conduct, we have worked hard to do our own work, conscientiously completed the work assigned by the leaders, and have greatly improved our ideological awareness and work ability.

  Be ideologically positive, be able to conscientiously implement the party's basic principles and policies, actively study theories, adhere to the four basic principles, abide by discipline and law, love and dedication, and have a strong sense of responsibility and dedication. Actively learn professional knowledge, have a good working attitude, be conscientious and responsible, and have good ideological quality, ideological quality and professional ethics.

  In terms of work attitude and diligence and dedication, he loves his job, can treat every job correctly and seriously, and can take the initiative to find his own shortcomings and learn to supplement them in time.

  Carry forward the fine tradition of hard work and simplicity, diligence and thrift, and helpfulness in life, always be honest, work diligently, unite colleagues, be pragmatic and realistic, optimistic and motivated, and always maintain a rigorous and serious work attitude and meticulous work style.

  In terms of working ability and professional knowledge, I have come to the company for more than a year, mainly to Huaye No. 2 Mine for internship. My internship at No.2 Mine was divided into three main departments. They are the excavation workshop, the surveying office and the geology office. In the tunnelling workshop and the surveying office, the main focus is on cognitive learning, and most of the time is spent in the geology office. During the internship in Huaye No. 2 Mine, with the enthusiastic help of leaders and colleagues, I also understood and participated in some specific work, although the work was trivial, but the harvest was very good. The main aspects are as follows:

  Responsible for the organization and management of geological technology: often go deep into the underground site, grasp the underground geological conditions, identify the geological factors affecting production and construction, compile the original geological catalogue and borehole catalogue, and report various relevant geological conditions in a timely manner; Ensure the normal continuity of production; Collect geological data of exploration and mining faces, keep abreast of geological conditions, conduct in-depth on-site investigation and research for production, and solve problems.

  During the work, I do not miss or waste every opportunity to exercise, and accelerate the continuous updating of my knowledge and the improvement of my own quality. At the same time, in his spare time, he asked leaders and colleagues about mine geology and mining knowledge, and strived to combine geology and mining, so that he could become a suitable geological person for mine work.

  1. During the internship, he often went down the mine to catalog and sample the tunnels and production prospecting boreholes.

  In the room, the underground cataloging data is organized. As a geological technician, I completed all the work on time according to the needs of production.

  1. Production prospecting: In the past year, on the basis of geological prospecting, in order to meet the needs of mining and continue to develop and extend, in order to further explore or determine the shape and quality characteristics of the ore body and the upgrading of reserves, various pit exploration projects and drilling projects have been excavated. So as to provide a detailed geological basis for the mining and guidance of the construction of the mine. Through a series of work such as production prospecting design, original cataloging, comprehensive cataloging, sampling, etc., we have submitted production prospecting materials such as 20~31 lines, 15~07 lines in the 22nd middle section, depot engineering, 2582 middle section ramp development, and 035 lines.

  2. Reserves verification: He has inspected the Zhongzhonggou fault ditch mining area, used AutoCAD, MapGIS and other software to be responsible for the reserve verification work, and participated in the preparation of the reserves verification report. I learned a lot during the whole process of surveying and compiling the reserve report.

  3. Deep and peripheral prospecting: further explore the small ore bodies at the edge and depth, and cooperate with engineers to strengthen peripheral prospecting. In order to meet the needs of the production and development of the mine, the geological reserves are constantly expanded.

  4. According to the existing data, determine the exploration type and exploration network, summarize the previous exploration results of the deposit and the comparison of exploration and mining, use the experience of typical ore deposits, and divide the difficulty of ore body exploration according to geological factors such as the small scale of the ore deposit, the complexity of the form, the stability of the thickness change, the complexity of the structure and the uniformity of the distribution of useful components in the ore. Determine the reasonable exploration type and exploration network, and correctly arrange the geological exploration project to achieve effective mineral reserves and meet the needs of mine mining design. It provides a geological basis for the rational development and utilization of mineral deposits.

  5. Loss dilution: prevent the exploitation of the rich and the abandonment of the poor; Strengthen construction management and ore drawing management to prevent the loss of mineral resources caused by blind exploitation; Accurately control the spatial distribution of ore body and the change law of ore quality, supervise the ore quality and grade of each stope, timely grasp the implementation of the production and mining plan and the quality dynamics of the stope, and strictly control the mixing of waste rock in the ore and the grade of ore outlet, so that the ore loss and dilution index are reduced to a predetermined level.

  6. In August 20xx, he participated in the high-level forum on metallogenic and prospecting prospects of Xitieshan lead-zinc mine.

  7. Assist colleagues in the establishment of digital mine models, and the reference and application of mine digital software will promote the change of technology and management methods of mining enterprises, which is expected to be completed by the end of October.

  Second, there are still problems in the work

  Since engaging in geological work, I have deeply felt the busyness of work and the weight of responsibility; Things and small things are pressed on the body, often pay attention to this end, but ignore that end, a little light-slight, and fail to work systematically in an all-round way, mainly in the following aspects:

  (1) I have just joined the work, I don't have enough experience, and I don't have a deep understanding of the complex section of the ore body.

  (2) The theoretical knowledge is not solid enough, the practical ability is poor, and the connection between theory and practice is insufficient.

  Although the above problems do not have a very good impact on my work, I always feel that I have not fulfilled my responsibilities as a technician, and I will strive to do better in my future work.

  During the internship and one year of work, I have a systematic understanding of the genesis of the ore deposit and the occurrence of the ore body in the whole mine, which will be very guiding for my future work in the mine. I also learned the calculation of reserves. I understand and master the basic process and basic working conditions of production prospecting, which will be very helpful for me to work in the mine in the future.

  3. Plans for future work

  By summing up the work of the past year, although there has been some progress and achievements, there are still deficiencies in some aspects, there are no innovative work ideas, and individual work has not been done well enough. In the future work, I will strive to find out the shortcomings in the work, so that I can overcome them in the future work, and at the same time, I also need to read more books, conscientiously study the norms and regulations and relevant documents, master professional knowledge, improve my work ability, strengthen my sense of responsibility, and do a good job in personal work in a timely manner. Constantly summarize and save, constantly spur yourself and enrich your energy, improve your own quality and business level, so as to adapt to the development of the times and the enterprise, and make progress and grow together with the company.

Chemical technician year-end summary sample essay 5

  1. Participate in the political education of the organization and strengthen theoretical study, and constantly improve their own political and ideological consciousness and theoretical level

  Over the past year, I have been well aware of the importance of political work, and as a technician, I am well aware that my political and ideological consciousness and theoretical level will directly affect the fighters of the institute, so in the past year, I have always been able to actively participate in the various political education organized by Curry, and actively transform my subjective thinking in combination with reality, and enhance my political firmness.

  2. Enhance business learning and continuously improve your business skills

  As a technician, I know that business work is the center of the work of the warehouse, over the past year, I have always been able to lead the support and help of the soldiers, around the business construction as the center to carry out the work, in the work at the same time, always think that as a technician, their own business level, will directly affect the completion of the work, no matter what task is completed, if their business level is not high, do not know how to complete the task, how can we drive everyone to complete the task? Therefore, I often study business theory knowledge carefully, and constantly enhance my business level through learning, enhance the familiarity and degree of equipment and equipment performance, use methods, technical parameters, and maintenance methods, and often read relevant books, and ask questions if I don't understand until the problem is understood. The same is true in other jobs; In such work as tree planting, painting, loading and unloading of wagons, processing of workpieces, production and installation of light boxes, etc., we actively cooperate with the work of the director and be a good left and right hand. Over the past year, with the support and help of the soldiers under my leadership, I have successfully completed all the tasks assigned by the superiors.

  3. Deficiencies

  In the past year, although some good results have been achieved, there are still some deficiencies.

  1. There is less time for theoretical learning, which needs to be strengthened.

  2. Their own physical fitness needs to be strengthened.

  3. There are still dead ends in management, and we must learn more from the director in the future and continuously strengthen our own work experience.

Chemical technician year-end summary sample article 6

  It has been a fruitful year, and for me personally, it has been a year of overall improvement in my professional skills. In the past year, as a technical cadre with engineering construction experience in the steam turbine engineering department of Ludian Engineering, I have participated in the technical work of multiple construction teams of the steam turbine major in part or in the whole process. It is in this busy and fulfilling year, under the unique conditions of Ludian Engineering, on the one hand, I have tested and further deepened my original engineering and technical knowledge, and on the other hand, I have initially built my own professional knowledge system.

  First, the work overview

  The technical work I am personally responsible for throughout the year can be roughly divided into several time periods from the perspective of the phased construction focus of the project.

  At the beginning of the new year, because the company's two major engineering projects in Haikou and Baima are in the critical period of construction, I am the only technical cadre in the entire steam fleet. As the only technical cadre of the steam engine team, I am responsible for the implementation of the technical work of all teams in the steam engine major. At the same time, the preparation plan of more than 60 sets of construction drawings for 21 large systems in the steam engine major is also a time-crunched, huge and extremely important work.

  During the period from the arrival of other technical cadres in April to August, my work focus has changed, and I am mainly responsible for the daily construction technical work of the first and second shifts and the unfinished phased construction tasks in the early stage. During this period, I am mainly responsible for the installation of steel platforms in 1 and 2# steam engine rooms, the hoisting and hauling of 3 high-pressure heaters, the installation of track beams and cranes in the circulating water pump room, the installation of circulating water pipelines in the factory area and the installation of high-pressure water supply pipelines in the 1# furnace hydraulic test in the first shift of pipelines.

  Since August, the technical tasks I have been responsible for have been gradually stripped, and the work tasks of the second shift of the pipeline have been fully delivered to the newly transferred technical cadres to the site in early September, and the work tasks have been reduced. In October this year, I took over the technical task of installing two pneumatic feed pumps, and in the face of a new task, my professional skills accumulation entered a new stage. Until now, my main focus has been on the installation of two steam feed pump units, the installation of temporary pipes for steam pipe purging, and the improvement of all steam piping systems for the construction of the first shift of pipelines.

  Second, the work summary

  In this year's work, I have never been intimidated by a series of heavy construction tasks and unfamiliar technical work. For the engineering and technical work I am engaged in, I have always held the view that I despise it consciously, after all, these jobs have mature construction experience to learn from, and it is the work that many engineers and technicians like me are engaged in together; However, I have taken a cautious approach to my working methods and strategies, because I can accumulate and draw valuable experience from these systematic work practices and work details.

  I regard every job assigned to me by the team leader as a valuable opportunity for personal work experience, the successful completion of the work task is my only work goal, and doing my best to solve the construction problem is my only work attitude. I participated in the whole process of each project construction task I was responsible for, and fully controlled the construction points of the unit project and the sub-project. Taking the installation of the steel platform of the steam engine room and the installation of circulating water pipes as an example, these two construction tasks are the earliest unit projects carried out by the steam engine team, during the construction of these two projects, I often rush between the main plant and the circulating water pipe ditch to check the implementation of the key points of the construction of the project, and discuss and solve the construction difficulties with the construction team leader. It is precisely because I really put myself into the construction process of the project that I have mastered a series of construction points such as the span and verticality of the steel platform columns, the elevation control of the installation of the steel column nodes, the quality control of the connection, and the installation and quality control of the circulating water pipe.

  To say bitter and tired, every worker on the construction site must have a deep experience, and as a team technician, I have a unique taste for it. At the busiest time of the project construction, I have to run nearly 20 construction teams every day, from the 61-meter layer of the boiler to the circulating water pump room, I have to run several times a day, there is only one reason - I am an engineering technician. Because of the needs of work, under the high temperature of more than 40 degrees in summer, I also discussed and solved the difficulties of circulating water pipe construction under the scorching sun with the construction team leader, and checked the construction quality of the project. Since entering the construction site this year, I have only taken 5 days off for more than 300 days, and the rest of the time, like the workers of the steam engine team, I have been working overtime and happily every day for the smooth commissioning and power generation of the company's first 600MW unit.

  As an employee of a modern large-scale enterprise, as an engineer and technician in the new era, in addition to bearing hardships and standing hard work, I am also constantly summarizing and improving. The conventional construction technology has long been firmly remembered in the depths of my mind, and the new problems and difficulties encountered in the construction process of the project are the focus of my summary. During the busiest period of the project, it is impossible to solve all the things on the same day, so I classify these things and deal with them in a planned way. Because the only engineering construction experience I had before the Luzhou project was the Panzhihua 135MW project, I had insufficient work experience and encountered many problems. For my own shortcomings and mistakes, I have corrected them in a timely manner, and for the fait accompli, the method I take is to treat it head-on, analyze the reasons from my own shortcomings and mistakes, sum up the lessons and make them my own wealth.

  In addition to technical work, I also held positions in the general branch of the Youth League and the installation group branch of the engineering project department, and I was also the head of the Qing'an Gang of the steam engine team. It has always been my good to participate in youth activities, and I have actively participated in every activity of the Youth League Committee, and I have fulfilled my responsibilities well in the activities of the Youth League Committee. In the area of youth activities, my only regret is that I was busy with work because I was unable to carry out more activities of young workers in the steam engine team according to the original plan, and the publicity task of the steam engine construction site in xx years was not completed well, which was the failure of my project.

  3. Summary

  I have always adhered to such a philosophical saying - Tianxingjian, a gentleman is self-improving, I have always demanded myself with the standard of an excellent engineer and technician, and I have made progress because of this requirement. The brilliance of the company needs us to create with hard work, and personal development needs to be achieved with hard work. In the future work, I will continue to guard against arrogance and rashness, work hard, unite closely with everyone in the big family of the company, use my brilliant youth to achieve the company's take-off, and write my own chapter with no regrets.