laitimes

The speed of 350 kilometers per hour!

On May 6, the reporter learned from the Luoyang Municipal Development and Reform Commission that the feasibility study report of the Jiaozuo to Pingdingshan high-speed railway via Luoyang was recently jointly approved by the China Railway Group and the Henan Provincial Government, marking the significant progress made in the preliminary work of the project and taking another key step towards the goal of full construction.

Jiaozuo via Luoyang to Pingdingshan high-speed railway, referred to as Jiaoluoping high-speed railway, railway grade is high-speed railway, design speed 350 km/h.

The line starts from the Jueshan Line of Zhengtai High-speed Railway, goes south through Qinyang City and Jiyuan City under the jurisdiction of Jiaozuo City, crosses the Yellow River and introduces Luoyang Longmen Station of Zhengxi High-speed Railway, and passes through Yichuan County, Ruyang County of Luoyang City, and Ruzhou City under the jurisdiction of Pingdingshan City, and connects to Pingdingshan West Station of Zhengyu High-speed Railway, with a new line length of 229.2 kilometers.

Five new stations were set up on the whole line: Qinyang West, Jiyuan East, Mengjin North, Ruyang East and Ruzhou South, and Luoyang Longmen and Jiaozuo West stations were rebuilt. Longmen Station built 3 sets of 7 lines in Jiaopingchang, and 1 set of 1 line was added in Zhengxi Station; the storage yard of Luoyang Longmen Station was expanded to be used by EMUs, and 4 inspection warehouses and 12 storage lines were added and conditions for further development were reserved.

The speed of 350 kilometers per hour!

The Jiaoluoping high-speed railway project is an integral part of the "Hunan Corridor", one of the eight verticals in the national "Medium and Long-term Railway Network Planning", which is of great significance to promote the accelerated rise of the central region, improve the transportation infrastructure conditions in western Henan, and accelerate the construction of a modern railway infrastructure system.

After the completion of the project, it will form a "cross" framework of Luoyang high-speed railway with Zhengxi high-speed railway, providing key support for Luoyang to build a nationally important comprehensive transportation hub city, which will greatly enhance the attractiveness and competitiveness of Luoyang city, and play a positive role in promoting high-quality economic and social development along the line, helping rural revitalization, and radiating and driving northwest Henan.

As a major railway construction project promoted by the state, the Jiaoluoping high-speed railway has received great attention from the National Development and Reform Commission, China Railway Group, and provinces and municipalities.

The speed of 350 kilometers per hour!

Since January 2022, the Jiaoluoping high-speed railway has been successfully included in the national "14th Five-Year Plan" for the development of modern comprehensive transportation system, under the strong leadership of the 4th promotion meeting of the provincial special class, the municipal special class has organized 51 special class meetings, went to Beijing to the province to coordinate and dock the work to form a normal state, the preliminary work of the project has been carried out in an orderly manner, and the provincial and municipal special classes have operated efficiently. Feasibility study and other important node work. With the joint efforts of many parties, the feasibility study report of Jiaoluoping high-speed railway was jointly approved by China Railway Group and the provincial government.

The relevant person in charge of the Luoyang Municipal Development and Reform Commission said that in the next step, according to the work deployment of the National Railway Group, under the unified leadership of the provincial and municipal special classes, the Municipal Development and Reform Commission will give full play to the functions of the Luoyang special class office of the Jiaoluoping high-speed railway, firmly establish the concept of "project is king", coordinate all member units, and actively cooperate with the project owners and design units to do a good job in the preliminary design and construction drawing design in the next stage, and strive to start construction of the Jiaoluoping high-speed railway as soon as possible, and play a positive role in the economic and social development of Luoyang as soon as possible. (Source: Luoyang Net, this number is pictured)

The speed of 350 kilometers per hour!