laitimes

The new "island" is officially opened!

author:Changzhou Economic Development Zone
The new "island" is officially opened!
The new "island" is officially opened!

Walk into the Qianyang Sewage Plant in Yaoguan Town

Centralized industrial wastewater pretreatment project on the side of the plant

It is running in an orderly manner

Wastewater from different industries

It is classified into 5 types of water conditioning tanks

The new "island" is officially opened!

The "Green Island" project, which was put into operation last year, has the capacity to process 2,000 tons of industrial wastewater per day, benefiting more than 150 surrounding enterprises and solving the problems of many industrial wastewater sources, small water volume and complex water quality of surrounding enterprises.

Liu Guoqiang, deputy director of the Ecological and Rural Work Bureau of Yaoguan Town

"The wastewater treated by 'Green Island' is discharged into the Qianyang Sewage Treatment Plant and then subjected to secondary treatment, realizing a one-stop integrated service. ”

The new "island" is officially opened!

2020

Jiangsu Provincial Department of Ecology and Environment

Carry out the pilot construction of "green island" in the province

Guide market entities to build shared environmental protection facilities

Reduce the cost of pollution control for small, medium and micro enterprises

Chen Wei, a staff member of the Ecological Environment Branch of Changzhou Economic Development Zone

"Our district is one of the birthplaces of the southern Jiangsu model, there are many township enterprises, these enterprises are 'small', can not afford the high cost of pollution control, and for the government, in order to prevent the enterprise sewage 'running and dripping', it is necessary to invest a lot of manpower and material resources to carry out inspections on weekdays. ”

Such a "dilemma" situation

Due to the advancement of the "Green Island" project

Gradually broken

Through the mode of government participation and diversified investment, at present, Changzhou Economic and Technological Development Zone has built 4 "Green Island" projects and 2 "Green Island" projects under construction, realizing the unified treatment of industrial wastewater, solid waste and hazardous waste for small and medium-sized enterprises, and ushering in a new life for industrial clusters such as coatings and flooring and home furnishings.

The new "island" is officially opened!
The new "island" is officially opened!

In June 2021, the small and medium-sized enterprise solid waste centralized public environmental protection facilities project was first put into use in Hengshanqiao Town, which is the first batch of "Green Island" projects in the city and the first in the district.

The new "island" is officially opened!
The new "island" is officially opened!

Walking into the plant, I saw more than 20 closed rooms in the classification and storage of a variety of hazardous waste, and the building on the side of the pretreatment area, high temperature room, precision instrument room and other areas, the staff is responsible for measuring the data of hazardous waste samples, and doing a good job of classification and testing.

The new "island" is officially opened!

In July of the same year, the centralized collection and treatment project of solid waste in the floor and home furnishing industry was put into use in Henglin Town. Chen Wei revealed that the "Green Island" project in the field of solid waste has formed a mature information tracking system for the whole process of hazardous waste collection, detection, classification and storage for small and medium-sized enterprises, benefiting more than 500 small and medium-sized enterprises with an annual waste output of less than 10 tons.

Chen Wei, a staff member of the Ecological Environment Branch of Changzhou Economic Development Zone

"Relying on these two projects, Changzhou Economic and Technological Development Zone took the lead in the city to pilot the creation of a 'one service, two coverage, three measures' hazardous waste collection system for small and micro enterprises, that is, the integrated service of small hazardous waste collection, transfer and disposal, full coverage of small hazardous waste collection areas and collection types, and through the coordinated promotion of the government, enterprises and the market, it solves the practical problems of small and micro enterprises that cannot be declared without procedures, cannot be stored without warehouses, and cannot be transferred without accounts. ”

Two "Green Island" operating enterprises

It not only provides integrated services for hazardous waste disposal

It also provides training services for hazardous waste management

The new "island" is officially opened!
The new "island" is officially opened!

Create an advanced model for the agglomeration and development of the coating industry

Changzhou Economic Development Zone is the first in the province to explore the way

In Hengshanqiao Town, the provincial major project - the green paint agglomeration area project has started, through the construction of "green island", to create a "public construction supporting auxiliary facilities sharing" model, to achieve the source control of pollution in the chemical park.

Miao Fei, deputy mayor of Hengshanqiao Town

"In the past, coating companies must be equipped with their own fire, environmental protection, emergency and other facilities, and the agglomeration area is uniformly equipped with Class A workshops, Class A warehouses and waste gas facilities treatment devices, the construction of rain and sewage pipelines, paint tank farms, central control rooms, accident emergency pools. ”

The new "island" is officially opened!

Renderings

The first phase of the agglomeration area plans to build about 112,000 square meters of supporting buildings such as workshops, R&D centers, environmental protection, fire protection, emergency response, and warehousing, and it is expected that the main body of the comprehensive building and testing workshop will be capped in late May. "It has attracted Chenguang high-performance automotive coatings, Huaxing low VOCs anti-corrosion coatings, Weston photovoltaic new energy coatings, Hongju special coating materials, etc., to encourage the merger and reorganization of coating companies and the development of groups. Miao Fei said.

Mr albert

"With the 'Green Island', the operating costs of enterprises are lower, the pressure on government management is reduced, and the 'dilemma' becomes a 'win-win'!"

Next

Changzhou Economic Development Zone will focus on both quantity and quality

Promote the construction of the "Green Island" project

Let the concept of shared pollution control be implemented in more areas

The new "island" is officially opened!

Text: Xu Chixiang

Pictured: Streets of various towns, Hu Jing

New Media Editor: Subtitler

Slide your finger to the bottom

Every like

The new "island" is officially opened!

And watching

The new "island" is officially opened!

It's all crucial!