It's about the whole family! Decorate the ground to be "down-to-earth"! The ground construction process looks at these 7 steps

author:Love space quality outfit

If the ground decoration is not in place, this large-scale rework is not a matter of spending money and time.

Therefore, we must pay attention to the strength of hard decoration and control the ground construction from the beginning of looking for a decoration company. We know that the structure of the ground is composed of the base layer and the surface layer, so in the construction of the ground engineering, no matter which type of ground is selected, the construction process of the base layer is basically the same, and the difference lies in the construction process of the surface layer.

Let's take the ground paving tile as an example to talk about the 7 steps of ground construction.

It's about the whole family! Decorate the ground to be "down-to-earth"! The ground construction process looks at these 7 steps

Step 1: Soak the tiles

Before the floor tiles are laid, they need to be placed in a bucket or other container containing water to ensure that they are completely soaked.

In particular, floor tiles with a water absorption rate of more than 10% must be completely soaked in water before they can be used. If the floor tiles with high water absorption rate are not soaked in water, direct use will absorb the moisture in the cement mortar, and the ground is likely to crack and fall off in the later stage......

Step 2: Grassroots treatment

Substrate treatment mainly refers to wetting the substrate by sprinkling water, sprinkling an appropriate amount of plain cement, and using tools such as roller brushes or brooms to apply evenly.

It should be noted that the base treatment should be carried out according to the amount of construction, that is, with half a day as the standard, how much area can be paved in half a day, and how large area of the base layer will be processed.

It's about the whole family! Decorate the ground to be "down-to-earth"! The ground construction process looks at these 7 steps

Step 3: Measure the pay-off

Measure to find the appropriate height, set the elevation position in both vertical and horizontal directions, and then set two elevation lines vertically and horizontally. The purpose of setting the elevation line is to prevent unevenness after the completion of the floor tile paving and ensure the flatness of the ground.

Step 4: Sediment priming

The mortar is prepared with cement and dry sand at a ratio of 1:3 and spread out on the ground. It should be noted that the mortar should not be too wet or completely free of water, and it is usually wet and loose as standard.

Xiao Ai suggests:

The height of the mortar should be about 3 mm higher than the elevation line after the floor tiles are placed, and the thickness of the mortar should also be guaranteed to be about 15 mm.

It's about the whole family! Decorate the ground to be "down-to-earth"! The ground construction process looks at these 7 steps

Step 5: Floor tile paving

Take a soaked floor tile and spread it on the mortar and beat it with a rubber hammer until it is flush with the elevation line. Then, remove the floor tiles and look at the mortar underneath. If there is a lack of and unevenness, the mortar needs to be filled and leveled.

After repeated operations in this process twice, the floor tiles are removed for the third time and a layer of plain cement slurry is evenly applied on the back of the floor tiles, and after being paved and beaten again and flush with the elevation line, it can be used as a benchmark brick. The paving of floor tiles can be constructed in accordance with the process of benchmark bricks, the difference is that the elevation line needs to be considered at the leveling, and the reference bricks also need to be referenced.

Step 6: Deal with the gaps

A certain gap should be reserved between adjacent floor tiles to prevent the thermal expansion and contraction effect from damaging the floor tiles. At the same time, due to the process of beating, it is inevitable that mortar will overflow between adjacent floor tiles.

After the floor tile is completely paved, the gap of the floor tile is cleaned, and after the mortar cleaning at the gap of the floor tile is completed, it is necessary to evenly set up two cross cards on each edge of each floor tile according to each gap, so as to prevent the mortar from moving the floor tile in the drying process, resulting in uneven and unsightly gaps.

It's about the whole family! Decorate the ground to be "down-to-earth"! The ground construction process looks at these 7 steps

Step 7: Construction acceptance

After the construction of the ground project is completed, it is necessary to check whether the color of the floor tiles is consistent, whether there is a hollow drum situation, and whether it is flat. In particular, whether the floor drainage of the bathroom is smooth.

If there is a problem, it is necessary to communicate with the construction personnel in time to solve it. Note that acceptance is important, and the owner will be present in person. It is best to ask who you are communicating with and who is responsible for construction quality assurance before decorating, and leave contact information to ask more and communicate more.

Xiao Ai finally reminded everyone again that the paving tiles must be the waterproof project of the base layer has been completed, and the holes in the ground have been sealed.

In particular, the waterproofing of the bathroom floor has been painted, and the closed water test has passed. Of course, these 7 steps of ground construction are a relatively common practice, and there may be other details specific to each room, if you are interested, we will talk about it separately later.