laitimes

Rendong Community's "Road Chief System" and "River and Lake Chief System" carry out inspection work and help the community environment transformation

author:Social services for children

In order to further deepen the responsibilities of the "road chief system" and "river and lake chief system", continuously improve the urban appearance, optimize the living environment of the residents, and create a harmonious and livable high-quality community, Rendong community has taken multiple measures to actively implement and promote the "road chief system", starting from improving the overall environment to achieve community beautification and order.

Rendong Community's "Road Chief System" and "River and Lake Chief System" carry out inspection work and help the community environment transformation

The community staff carries out the "road chief system" inspection work every day in the responsible road section of the jurisdiction, and the inspection work is mainly based on the environmental sanitation in the jurisdiction, the vehicles on both sides of the road are parked indiscriminately, the roadside small advertisements, the green belt sundries, the street is dried, and the stores along the street occupy the road to investigate and remediate. For uncivilized phenomena such as non-standard operation of stores along the street and random parking of vehicles, community staff carry out active persuasion and unified arrangements to ensure the full implementation of the "road chief system".

When the community staff inspected the community road, they found that a water meter manhole cover in the middle of the road was damaged. In order to avoid the damage to the manhole cover caused by the inconvenience of pedestrians or falls, Ren Dong community staff immediately contacted the "Jiangchenghe Xiaoqing" volunteer service team to help repair the sewage manhole cover, the service team opened the sewage manhole cover, and suddenly the smell was stinking, and the wellhead was full of foul-smelling sewage. The maintenance crew began to clean it manually, and a large amount of dirt was shoveled out and removed. "There must be a blockage point in the main pipeline, and if it is not dredged, the sewage absorption is only a symptom but not a cure. "Dredging the blockages in the well became the key. Subsequently, the community staff cooperated with the dredging master to investigate the entire sewage drainage system in the building one by one, and finally, the main pipeline was dredged.   

After a day of hard work, the sewage pipe of Qianjin No. 2 Road in Rendong Community has been effectively dredged. Residents have said that now the sewers are unobstructed, and life is more convenient and comfortable. At the same time, they also expressed their heartfelt gratitude and respect for the efforts of the staff of Yixin Community.

Rendong Community's "Road Chief System" and "River and Lake Chief System" carry out inspection work and help the community environment transformation
Rendong Community's "Road Chief System" and "River and Lake Chief System" carry out inspection work and help the community environment transformation
Rendong Community's "Road Chief System" and "River and Lake Chief System" carry out inspection work and help the community environment transformation
Rendong Community's "Road Chief System" and "River and Lake Chief System" carry out inspection work and help the community environment transformation
Job

Read on